Venue: George Meehan House, 294 High Road, N22 8JZ
Contact: Kodi Sprott, Principal Committee Coordinator 5343, Email: kodi.sprott@haringey.gov.uk
| No. | Item |
|---|---|
|
FILMING AT MEETINGS Please note this meeting may be filmed or recorded by the Council for live or subsequent broadcast via the Council’s internet site or by anyone attending the meeting using any communication method. Members of the public participating in the meeting (e.g. making deputations, asking questions, making oral protests) should be aware that they are likely to be filmed, recorded or reported on. By entering the ‘meeting room’, you are consenting to being filmed and to the possible use of those images and sound recordings.
The Chair of the meeting has the discretion to terminate or suspend filming or recording, if in his or her opinion continuation of the filming, recording or reporting would disrupt or prejudice the proceedings, infringe the rights of any individual, or may lead to the breach of a legal obligation by the Council. Minutes: The Chair referred Members present to agenda Item 1 as shown on the agenda in respect of filming at this meeting, and Members noted the information contained therein. |
|
|
APOLOGIES To receive any apologies for absence. Minutes: Apologies for absence were received from Cllr Da Costa
|
|
|
URGENT BUSINESS The Chair will consider the admission of any late items of Urgent Business. (Late items of Urgent Business will be considered under the agenda item where they appear. New items of Urgent Business will be dealt with under item 18 below). Minutes: There were no items of urgent business
|
|
|
DECLARATIONS OF INTEREST AND CONFLICTS OF INTEREST A member with a disclosable pecuniary interest or a prejudicial interest in a matter who attends a meeting of the authority at which the matter is considered:
(i) must disclose the interest at the start of the meeting or when the interest becomes apparent, and (ii) may not participate in any discussion or vote on the matter and must withdraw from the meeting room.
A member who discloses at a meeting a disclosable pecuniary interest which is not registered in the Register of Members’ Interests or the subject of a pending notification must notify the Monitoring Officer of the interest within 28 days of the disclosure.
Disclosable pecuniary interests, personal interests and prejudicial interests are defined at Paragraphs 5-7 and Appendix A of the Members’ Code of Conduct
The Public Service Pensions Act 2013 defines a conflict of interest as a financial or other interest which is likely to prejudice a person’s exercise of functions. Therefore, a conflict of interest may arise when an individual:
i) Has a responsibility or duty in relation to the management of, or provision of advice to, the LBHPF, and
ii) At the same time, has: - a separate personal interest (financial or otherwise) or - another responsibility in relation to that matter,
giving rise to a possible conflict with their first responsibility. An interest could also arise due to a family member or close colleague having a specific responsibility or interest in a matter.
At the commencement of the meeting, the Chair will ask all Members of the Committee and Board to declare any new potential conflicts and these will be recorded in the minutes of the meeting and the Fund’s Register of Conflicts of Interest. Any individual who considers that they or another individual has a potential or actual conflict of interest which relates to an item of business at a meeting must advise the Chair prior to the meeting, where possible, or state this clearly at the meeting at the earliest possible opportunity.
Minutes: There were none. |
|
|
BREACHES OF THE LAW The pension fund self reported to the pensions regulator, notifying them of the McCloud determination made and that the project will conclude on August 2026, as opposed to the initial regulatory deadline of August 2025. TPR has acknowledged the report and have responded that they are satisfied with our self report and no further action will be taken on the matter. Minutes: The pension fund self reported to the pensions regulator, notifying them of the McCloud determination made and that the project will conclude on August 2026, as opposed to the initial regulatory deadline of August 2025. TPR has acknowledged the report and have responded that they are satisfied with our self report and no further action will be taken on the matter.
|
|
|
DEPUTATIONS / PETITIONS / PRESENTATIONS / QUESTIONS To consider any requests received in accordance with Part 4, Section B, paragraph 29 of the Council’s constitution. Minutes: There were none. |
|
|
RECORD OF TRAINING UNDERTAKEN SINCE LAST MEETING Note from the Head of Legal and Governance (Monitoring Officer) When considering the items below, the Committee will be operating in its capacity as ‘Administering Authority’. When the Committee is operating in its capacity as an Administering Authority, Members must have due regard to their duty as quasi-trustees to act in the best interest of the Pension Fund above all other considerations. Minutes: It was stated that Councillors Bevan and Iygkaran completed all the training provided under the Hymans LOLA solution.
|
|
|
To confirm and sign the minutes of the Pensions Committee and Board meeting held on 24th July as a correct record. Minutes: The minutes of the Pensions Committee and Board meeting held on 24th July were approved as a correct record.
|
|
|
RESPONSIBLE INVESTMENT POLICY The Fund has finalised its draft Responsible Investment Policy to ensure that it remains aligned with best practice, regulatory requirements, and the long?term interests of members and stakeholders. Responsible investment has become an increasingly important aspect of pension fund governance, reflecting the need to integrate environmental, social, and governance (ESG) considerations into investment decision?making.
Minutes: The Fund has finalised its draft Responsible Investment Policy to ensure that it remains aligned with best practice, regulatory requirements, and the long-term interests of members and stakeholders. Responsible investment has become an increasingly important aspect of pension fund governance, reflecting the need to integrate environmental, social, and governance (ESG) considerations into investment decision-making.
Councillor White raised concerns about the Responsible Investment policy and stated that he was not happy with the current version.
There was a 5-minute adjournment.
Recommendations:
The Pensions Committee and Board:
3.1. Noted and provided any comments regarding the draft responsible investment policy (Appendix 1)
3.2. That the draft Responsible Investment Policy to be brought back to the committee in January for approval to go out to consultation
|
|
|
PENSIONS ADMINSTRATION UPDATE This report provides the Pensions Committee and Board (PCB) with the following updates regarding Pension Fund’s administration activities: a. Pension Fund membership update b. Online Member Self Service portal update c. Update on Service Level Agreement (SLA) statistics d. Pensions Dashboard Project (PDP) update e. Approval of new Admission Agreements f. Collection of Employer and Employee Contributions update g. Internal Disputes Resolution Procedures (IDRPs) h. Update on Annual benefit statements i. McCloud Project update j. Ongoing Consultations
Additional documents: Minutes: This report provided the Pensions Committee and Board (PCB) with the following updates regarding Pension Fund’s administration activities:
a. Pension Fund membership update b. Online Member Self Service portal update c. Update on Service Level Agreement (SLA) statistics d. Pensions Dashboard Project (PDP) update e. Approval of new Admission Agreements f. Collection of Employer and Employee Contributions update g. Internal Disputes Resolution Procedures (IDRPs) h. Update on Annual benefit statements i. McCloud Project update j. Ongoing Consultations
The Fund had finalised its draft Responsible Investment Policy to ensure alignment with best practice, regulatory requirements, and the long?term interests of members and stakeholders. Responsible investment had become an increasingly important part of pension fund governance, highlighting the need to integrate environmental, social, and governance (ESG) factors into investment decisions.
The Pension Fund had reviewed its investments, modelled ESG risk thresholds, and finalised a Responsible Investment Policy with a clear engagement framework. The policy had embedded ESG principles into decision?making, provided mechanisms for influence or divestment, and prepared for implementation in April 2026 following consultation with LCIV and the pensions community.
- Data inconsistencies had been identified against the Pensions Dashboard Programme standards, though they had not involved member?level data affecting benefits. Instead, the issues had related to communication details such as home and email addresses, where certain symbols and formatting had not been compatible with the standards. These data queries had been corrected, and all address records were subsequently brought into compliance with the programme requirements Recommendations: The Pensions Committee and Board: 3.1. Noted this report and the information provided regarding the Pension Fund’s administration activities for the quarter ending 30 September 2025. 3.2. Noted and approve the admission of the entities listed in Section 6.15 of this report, as new employers participating in the Haringey Local Government Pension Scheme. 3.3 Delegated authority to the Corporate Director of Finance and Resources to negotiate, agree and enter into any admission agreements with admission bodies and schools for the purposes of joining the Local Government Pension Scheme
|
|
|
GOVERNANCE REVIEW IMPLEMENTATION PLAN This paper has been prepared to update the progress of implementation of the funds governance review recommendations following the review undertaken by the Funds independent advisor. Officers welcome comment[TE1] from the Pensions Committee and Board on the actions achieved to date.
[TE1]Do we need to say somewhere that the recommendations will also align with the outcome of the consultation and new requirements from government on good governance or that the independet advisor carried out its review in line with these requirements Additional documents: Minutes: The paper had been prepared to provide an update on the progress made in implementing the Fund’s governance review recommendations, following the review conducted by the Fund’s independent advisor. Officers had invited comments from the Pensions Committee and Board on the actions achieved to date. Following the governance review conducted by the Fund’s independent advisor, 26 recommendations had been presented to the Pensions Committee and Board. These had been grouped into three categories: Fundamental and Urgent, Easily Implementable, and To be Implemented from 2025/26. Officers had subsequently reviewed all 26 recommendations and prepared an implementation plan, taking account of the categories to which each recommendation had been assigned. - At the last investment review meeting, a point had been raised about aligning the decision?making process with the responsibilities of board members. This suggestion had been well received, with general agreement that it was a good idea. It had been noted that the addition to the list would be straightforward, and a commitment had been made to record and include it. Recommendations: The Pensions Committee and Board: 3.1. Noted and provided any comments regarding the implementation of the fund governance review recommendations.
|
|
|
FUND RISK MANAGEMENT POLICY This paper has been prepared to update on the progress of implementation of the governance review recommendations 10, 11 and 12 which relate to risk management. Officers welcome comment from the Pensions Committee and Board on the actions achieved to date.
Additional documents:
Minutes: The paper had been prepared to provide an update on the progress made in implementing governance review recommendations 10, 11, and 12, all of which related to risk management. Officers had invited the Pensions Committee and Board to comment on the actions achieved to date. Following the governance review conducted by the Fund’s independent advisor, a series of recommendations had been presented to the Pension Committee Board (PCB). These had been intended to strengthen oversight, improve decision?making, and ensure alignment with best practice in pension fund governance. Several of the recommendations had focused on risk management. Recommendation 10 had called for the preparation of a Pension Fund Risk Policy for PCB approval. Recommendation 11 had required a review and revision of the Risk Management Process to implement a cycle in line with CIPFA’s 2018 guidance. Recommendation 12 had proposed redesigning the Risk Register, with risks listed under the seven headings set out in that guidance. The Pension Fund Risk Policy had outlined the framework for identifying, assessing, managing, and monitoring risks that could affect the Fund’s long?term objectives. It had ensured practices were aligned with regulatory guidance and industry standards, supported informed decision?making, and promoted transparency and accountability in managing pension assets. The Pension Fund Risk Management Strategy and Process had set out the approach officers would take in preparing the redesigned Risk Register, as required by recommendation 12. This updated register had been scheduled for presentation to the PCB at its January 2026 meeting for comment and approval. Recommendations: The Pensions Committee and Board: 3.1. Noted and provided any comments regarding the implementation of recommendations 10, 11 and 12 of the Governance review, relating to the Risk Management Policy. 3.2. Approved the Fund Risk Management Policy which has been prepared in response to recommendation 10 of the Governance review.
|
|
|
This paper provides an update on the Fund’s risk register and an opportunity for the Committee and Board to further review the risk score allocation. Additional documents:
Minutes: The Pension Fund’s risk register had been presented to give the Pensions Committee and Board an opportunity to further review the allocation of risk scores. The Pensions Regulator had required the Pension Committee and Board (PCB) to establish and implement internal controls for the Fund to ensure compliance with scheme rules and legal requirements. A complete version of the risk register had been approved in September 2016, and since then different sections had been reviewed at each subsequent meeting, with changes agreed to keep strategic risk monitoring current. The risk register had covered administration, governance, investment, accounting, funding, and legislative risks. Funding?Liability risks had been reviewed and updated for PCB feedback, with other areas scheduled for future meetings. Risks had been scored on impact and likelihood, using a 1–5 scale and a Red?Amber?Green rating system. Directional indicators had shown whether risks were worsening, stable, or improving compared to previous assessments. Key risks identified in the short to medium term had included:
Officers had confirmed that the Fund’s risk register would remain under constant review. - Councillors had asked whether there were any comments on IMV One and market volatility, including the perceived risks around the AI bubble. It had been explained that such risks would be managed under the rebalancing policy. Equities had still been viewed as attractive long?term assets, but allocations should not exceed target levels. - By the end of September, the Fund had been around 7% overweight in equities, a position likely to have increased due to strong performance. The currency hedging position in the portfolio had also been noted. Overall, it had been considered a sensible approach to rebalance, secure profits, and reduce exposure to equities. Recommendations: The Pensions Committee and Board: 3.1. Noted and provided any comments on the Fund’s risk register. The area of focus for review at this meeting will be Funding-Liability Risks.
|
|
|
PENSION FUND QUARTERLY INVESTMENT AND PERFORMANCE UPDATE This report provides the Pensions Committee and Board (PCB) with the following updates on the Pension Fund’s performance for the quarter ended 30 September 2025:
a. Overview of fund performance including funding position update b. Investment manager performance c. Asset allocation d. Investments with the pool e. LAPFF Engagement Update f. Independent advisor’s market commentary
Additional documents: Minutes: The report had provided the Pensions Committee and Board (PCB) with updates on the Pension Fund’s performance for the quarter ending 30 September 2025. These updates had included an overview of fund performance and the funding position, investment manager performance, asset allocation, investments with the pool, the LAPFF engagement update, and the independent advisor’s market commentary.
- Concerns had been raised that members were not always provided with the right kind of information to view performance in proper context. Arbitrary dates had not been considered helpful, given the complexity of the business. Instead, custom benchmarks had been used to measure asset allocation, showing whether managers were delivering within their respective sectors. Flaws in reporting had been acknowledged, and it had been agreed these needed to be addressed to properly assess sector performance.
- It had been noted that overall asset allocation was not questioned, but comparisons over different periods illustrated the impact of allocation choices. For example, over three years, the benchmark had shown a 10.4% return, while an all?equity allocation would have produced 16.2% and an all?bond allocation –2%. The point had been made that the environment in which the Fund operated needed to be considered, so performance could be understood in context, identifying diversification and delivery across exposures.
- This issue had first been raised years earlier, leading to the establishment of the Investment Working Group, though progress on developing a new reporting format had not been made. Work with Tim on producing a different format had begun but not been completed, and it had been suggested that this should be revisited to provide clearer contextual reporting.
- Councillors had also asked about the Fund’s five?year return of 7.2%, specifically whether this had met the targets set five years earlier. Officers had responded that they would need to check records, noting the best comparison would be between the expected return from the last reviewed investment strategy and the actual experience, focusing on the aggregate picture.
Recommendations:
The Pensions Committee and Board:
3.1. Noted the information provided in section 6 of this report regarding the Fund’s investment performance and activity for the quarter ended 30 September 2025.
|
|
|
HARINGEY PENSION FUND ANNUAL REPORT This report presents the Haringey Pension Fund Annual Report and unaudited accounts for 2024/25 to the Pensions Committee and Board for approval, subject to the successful completion of the external audit exercise. The outcome of the External Audit will be presented to PCB in January 2026.
Additional documents: Minutes: The report had presented the Haringey Pension Fund Annual Report and unaudited accounts for 2024/25 to the Pensions Committee and Board for approval, subject to the successful completion of the external audit. The outcome of the external audit had been scheduled for presentation to the PCB in January 2026.
According to the Local Government Pension Scheme (LGPS) Regulations 2013, LGPS funds had been required to produce an annual report each year. The report had served as a key means of communication between the pension fund and its stakeholders and had to be published by 1 December following the end of the financial year.
- It had been assumed that the report was only available online for members and not issued in hard copy. Concerns had been raised about accessibility, particularly text size, and whether checks had been carried out to meet standards for people with impaired vision. Officers had confirmed the report was uploaded to the pension fund website, with no hard copies produced, and agreed to review the accessibility of the online version. - Questions had also been raised about management expenses, with confirmation given that all investment and administration fees were included in Table 11, with a breakdown of investment management expenses in Table 11A. A suggestion had been made to present costs as a proportion (e.g., per £1 million) to give members clearer context, which was considered potentially useful but not standard practice. Officers had explained that while administration costs per member were shown, investment and management fees were not typically presented in this way. - It had been noted that the accounts followed strict guidance and standard formats, limiting flexibility. However, officers agreed to consider whether proportional cost information could be added in future reports, possibly within the narrative sections rather than the formal tables. Clarification had also been provided that the cost per member figure referred only to administration costs, including staff, software, and other ad hoc expenses.
Recommendations
The Pensions Committee and Board:
3.1. Noted and approved the draft Haringey Pension Fund Annual Report for 2024/25 appended as Appendix 1 to this report.
3.2. Approved the upload of the Haringey Pension Fund Annual Report to the Haringey Pension Fund’s website.
|
|
|
The purpose of the paper is to identify topics that will come to the attention of the Committee and Board in the next twelve months and to seek members’ input into future agendas. Suggestions for future training are also requested. Additional documents: Minutes: The purpose of the paper had been to identify topics expected to come before the Committee and Board over the following twelve months and to seek members’ input into future agendas. It had also requested suggestions for future training.
The PCB had reviewed key priorities for the next 9–12 months, including the Responsible Investment Policy, asset transition to the pool, and the Pension Fund Business Plan. Members had been encouraged to complete training via LOLA, and attendance at the LAPFF conference had been confirmed. The Responsible Investment Policy had been deferred to January, and progress on priorities and governance review implementation had been noted.
Recommendations
The Pensions Committee and Board:
3.1. Noted and provided any comments on the progress made towards the agreed key priorities outlined in Table 1 of this report, specifically in regarding the responsible investment policy development and implementation of the fund governance review recommendations.
3.2. Identified additional matters and training requirements for inclusion within the Pensions Committee and Board’s forward plan.
|
|
|
Haringey Pension Fund Actuarial Valuation 2025 Minutes: The report had provided the Pensions Committee and Board (PCB) with information on the 2025 actuarial valuation exercise, which had been underway and scheduled to recur at several upcoming PCB meetings. It had also included initial advice on assumptions from the Fund’s actuary, Hymans Robertson, the preliminary valuation results for the entire fund, an overview of the Funding Strategy Statement review, and a general update on progress to date.
Recommendations
The Pensions Committee and Board:
3.1. Noted Hymans Robertson’s Advice on Assumptions paper, appended as Confidential Appendix 1, and the advice contained therein.
3.2. Agreed the methodology and valuation assumptions proposed by the Pension Fund’s actuary, Hymans Robertson as outlined in Confidential Appendix 1 to this report.
3.3. Noted Haringey Pension Fund’s draft Actuarial Valuation Results paper, prepared by the Pension Fund’s Actuary, Hymans Robertson and appended as Confidential Appendix 2, and the advice contained therein.
3.4. Noted Asset Liability Management paper appended as Confidential Appendix 3 to this report.
3.5. Noted the overview of the draft Funding Strategy Statement, appended as Confidential Appendix 4 to this report.
|
|
|
NEW ITEMS OF URGENT BUSINESS Minutes: There were none. |
|
|
DATES OF FUTURE MEETINGS To note the dates of the next meeting is 22nd January 2026.
Minutes: 22nd January 2026 |
|
|
EXCLUSION OF THE PRESS AND PUBLIC Items 21-27 are likely to be subject to a motion to exclude the press and public from the meeting as they contain exempt information as defined in Section 100a of the Local Government Act 1972 (as amended by Section 12A of the Local Government Act 1985); para 3 – namely information relating to the financial or business affairs of any particular person (including the authority holding that information) and para 5 – information in respect of which a claim to legal professional privilege could be maintained in legal proceedings. Minutes: the meeting as they contain exempt information as defined in Section 100a of the Local Government Act 1972 (as amended by Section 12A of the Local Government Act 1985); para 3 – namely information relating to the financial or business affairs of any particular person (including the authority holding that information) and para 5 – information in respect of which a claim to legal professional privilege could be maintained in legal proceedings.
|
|
|
EXEMPT RESPONSIBLE INVESTMENT POLICY Minutes: The exempt information was considered. |
|
|
EXEMPT - PENSION FUND QUARTERLY UPDATE AND INVESTMENTS UPDATE As per item 9. Minutes: The exempt information was considered.
|
|
|
EXEMPT INVESTMENT REVIEW STRATEGY Minutes: The exempt information was considered.
|
|
|
EXEMPT ASSET REBALANCING Minutes: The exempt information was considered.
|
|
|
EXEMPT Haringey Pension Fund Actuarial Valuation 2025 Minutes: The exempt information was considered.
|
|
|
EXEMPT MINUTES To confirm and sign the exempt minutes of the Pensions Committee and Board meeting on 24/07/2025 as a correct record. |
|
|
NEW ITEMS OF EXEMPT URGENT BUSINESS |