Statutory Forward Plan - 7 January 2026 - 30 April 2026 - Version 158  (07/01/2026 to 30/04/2026, Leader of the Council)

Plan items
No. Item

1.

Approval of Welbourne Land of Appropriation

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Oct 2024 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 02/08/2024

Anticipated restriction: Part exempt  - view reasons

2.

Outcome of the public engagement on bus priority proposals and creation of a Red Route along A504 West Green Road

Decision maker:  Cabinet Member Signing

Decision due:   Between 7 Oct 2024 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 06/09/2024

Anticipated restriction: Part exempt  - view reasons

3.

Approval of Homes for Haringey Management Agreement

Decision maker:  Leader of the Council

Decision due:   Between 3 Mar 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 04/12/2024

Anticipated restriction: Part exempt  - view reasons

4.

Approval of Haringey Community Benefit Society Management Agreement

Decision maker:  Leader of the Council

Decision due:   Between 31 Mar 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 03/02/2025

Anticipated restriction: Part exempt  - view reasons

5.

Cabinet paper correction - Crawley Road

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Jun 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/05/2025

Anticipated restriction: Part exempt  - view reasons

6.

Adopting a new Clear Communal Areas Policy

Decision maker:  Cabinet Member Signing

Decision due:   Between 7 Jul 2025 and 20 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 06/06/2025

Anticipated restriction: Public  -

7.

Adopting a new Garage Allocations Policy

Decision maker:  Cabinet Member Signing

Decision due:   Between 7 Jul 2025 and 20 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 06/06/2025

Anticipated restriction: Public  -

8.

Hamilton Close - Major Works

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Aug 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 03/07/2025

Anticipated restriction: Part exempt  - view reasons

9.

Hostels Refurbishment Programme

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Aug 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 03/07/2025

Anticipated restriction: Part exempt  - view reasons

10.

Contract uplift for voids work programme to Haringey Community Benefit Society and Private Sector Lease Properties

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Sep 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 06/08/2025

Anticipated restriction: Part exempt  - view reasons

11.

Security Contract

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Sep 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 06/08/2025

Anticipated restriction: Part exempt  - view reasons

12.

The revision of annual parking permit fees for the Car Club Scheme in Haringey, following feedback from the primary operator (ZipCar) and a reassessment of benchmarking data used to inform the January 2025 Cabinet decision.

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Sep 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 06/08/2025

Anticipated restriction: Public  -

13.

To extend existing contracts for the delivery of fire safety works resulting from fire risk assessments.

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Sep 2025 and 20 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 06/08/2025

Anticipated restriction: Part exempt  - view reasons

14.

Direct Award for Voids Works to Haringey Community Benefit Society and Private Sector Lease Properties

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Nov 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

15.

Haringey Council Feedback Policy (Update to existing policy)

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Nov 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Public  -

16.

Approval to commence Procurement: Hornsey Library Roof Condition Works

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Nov 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

17.

Dawlish & Scales Road, N17 - Approval of housing construction contract

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Nov 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

18.

To award a new asbestos contract and appoint a UKAS accredited asbestos contractor for a period of four years

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Nov 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

19.

Procurement of Enforcement Agency services via the YPO Framework

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Dec 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

20.

School Streets - 2024/2025

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Dec 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Public  -

21.

Selby Urban Village - procurement strategy for heat supply arrangements

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Dec 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

22.

To extend existing contract for the delivery of communal heating and ventilation only

Decision maker:  Cabinet Member Signing

Decision due:   Between 4 Dec 2025 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

23.

Award of Housing Asset Management Partnering Contracts

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

24.

Contract for the provision of Information, Advice and Guidance Service Extension

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

25.

Corporate Write Off and Write Back Policy

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

26.

Extension of the contract for the provision of environmental enforcement services

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

27.

Repurpose Customer Services Space for Homelessness Prevention Hub

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

28.

Substance Misuse Treatment and Residential Rehab Procurement

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

29.

Supported Accommodation - licence fee and services charges

Decision maker:  Cabinet Member Signing

Decision due:   Between 6 Jan 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

30.

Schools Block Funding Model Strategy for 2026-27

Decision maker:  Cabinet Member Signing

Decision due:   Between 19 Jan 2026 and 31 Jan 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

31.

Acquisition of 12 Council homes at 67 Lawrence Road, London N15 4GL

Decision maker:  Cabinet

Decision due:   20 Jan 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

32.

Adopting an updated Damp and Mould Policy

Decision maker:  Cabinet

Decision due:   20 Jan 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Public  -

33.

Approval of Haringey Library Strategy 2026-30

Decision maker:  Cabinet

Decision due:   20 Jan 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Public  -

34.

Single Use Plastics Policy and Action Plan

Decision maker:  Cabinet

Decision due:   20 Jan 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

35.

Coleridge Primary School - Condition Works - Award of Construction Works Contract.

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

36.

Haringey Council Audio Visual Supply, Installation, Configuration & Support Contract

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

37.

Tiverton Road - Award of Construction Contract

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

38.

Approval of the Procurement of Integrated Drug and Alcohol Treatment Services New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  - view reasons

39.

Approval to enter into the Inter Authority Agreement (IAA) to join the contract for the pan- London online sexual health services New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

40.

Approval to Procure Contractor for Henrietta House and Carlton Lodge New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

41.

Archway Road, N6 - Award of construction contract New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  -

42.

Award of Contract for Provision of Operational Vehicles New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

43.

Award of contract for the acquisition of Fixtures, Fittings and Equipment (FF&E) for the Civic Centre New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

44.

Award of framework contract for Salary Sacrifice employee vehicles. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

45.

Crowland Primary School - Condition Works - Permission to initiate tender action for a Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

46.

Earlsmead Primary School - Condition Works - Permission to initiate tender action for a Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

47.

Haringey Local suppliers Catering Framework and Concession for the Welcome café in the Civic Centre. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

48.

Homes for Haringey - approval of new Auditors New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

49.

Kings Road Car Park N17 - award of construction contract New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

50.

Lift Maintenance Contract - approval for one year extension

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

51.

Mulberry Primary School - Condition Works - Permission to initiate tender action for a Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

52.

New Build Aids and Adaptation Works New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

53.

Request to grant permission to accept funding through the Family Hubs and Start for Life grant and Variation and extension of the Contract for the provision of Parent Infant Psychology Service New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

54.

Selby Urban Village – award of main works contract for the construction of Selby Urban Village and next steps. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 31 May 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

55.

Variation to Provision of Unified Digital Engagement Platform New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

56.

100 Woodside Avenue, N10- Sales strategy and updated total scheme costs

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

57.

Admission to Schools - Determined Admission Arrangements for 2027/28

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

58.

Adoption of the Capital Strategy 2026-2036 New!

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

59.

Approval for an Application for Secretary of State consent to enable leases of over 7 years to the Haringey Community Benefit Society

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 06/06/2025

Anticipated restriction: Part exempt  - view reasons

60.

Approval of next steps for Wood Green Station Road sites New!

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

61.

Approval of the Voluntary and Community Sector Action Plan

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

62.

Approval to tender valuation and survey services relating to the acquisitions programme

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

63.

Budget 2026/2027 and Medium Term Financial Strategy 2030/2031

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

64.

Contract for the delivery of a voids work programme to Haringey Community Benefit Society (HCBS) and Private Sector Let (PSL) properties

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 08/10/2025

Anticipated restriction: Part exempt  - view reasons

65.

Down Lane Park - Phase 2a:Community Hub - Permission to initiate tender action for a Construction Works Contract

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

66.

Haringey's Toilet Strategy and Action Plan, 2025-30

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

67.

High Road West - Next Steps New!

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

68.

Housing Revenue Account Business Plan 2026/27 New!

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

69.

Policy Update on Schools in Financial Difficulty

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

70.

Pride in Place Funding New!

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Culture, Strategy and Communities

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

71.

Provision of internal audit services

Decision maker:  Cabinet Member Signing

Decision due:   Between 5 Feb 2026 and 30 Apr 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Part exempt  - view reasons

72.

Woodridings Court N22 - New Build - Award of construction contract

Decision maker:  Cabinet

Decision due:   10 Feb 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/05/2025

Anticipated restriction: Part exempt  - view reasons

73.

2025/26 Finance Update Quarter 3

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/05/2025

Anticipated restriction: Public  -

74.

Adoption of a Digital Inclusion Policy New!

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

75.

Approval of a draft Older People's Housing Strategy for consultation

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

76.

Approval to consult on a new Sheltered Housing Allocations Policy

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

77.

Award two Heating Contracts to successful bidder.

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

78.

Downsizing Policy New!

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Public  -

79.

Funding Acceptance from Ministry of Housing, Communities and Local Government (MHCLG)

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Public  -

80.

Procurement request for Responsive Repairs Sub-contracts

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 08/12/2025

Anticipated restriction: Part exempt  - view reasons

81.

Recycling and Waste Collection, Street Cleansing and Ancillary Services Contract Award New!

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Environment and Resident Experience

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

82.

To go to market and tender new communal heating and ventilation contract

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Adults, Housing and Health

Notice of proposed decision first published: 04/11/2025

Anticipated restriction: Public  - view reasons

83.

Variation to agreement to dispose of land on the corner of Coburg Road and Western Road, Wood Green New!

Decision maker:  Cabinet

Decision due:   10 Mar 2026

Lead officer:  Corporate Director of Finance and Resources (S151 Officer)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

84.

Crowland Primary School - Condition Works - Award of Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Jun 2026 and 31 Oct 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

85.

Earlsmead Primary School - Condition Works - Award of Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Jul 2026 and 31 Oct 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons

86.

Mulberry Primary School - Condition Works - Award of Construction Works Contract. New!

Decision maker:  Cabinet Member Signing

Decision due:   Between 1 Jul 2026 and 31 Oct 2026

Lead officer:  Corporate Director of Children's Services (Statutory DCS)

Notice of proposed decision first published: 07/01/2026

Anticipated restriction: Part exempt  - view reasons