Issue details

Hornsey School for Girls - Contract award for urgent condition and safety works

Decision type: Key

Decision status: For Determination

Notice of proposed decision first published: 28/07/2023

Anticipated restriction: Public  -

Decision due: Between 26 Jul 2023 and 1 Aug 2023 by Cabinet Member Signing

Following an inspection of the Reinforced Autoclaved Aerated Concrete (RAAC) ceiling of the Teaching Block by an external structural engineer, it was recommended on 26th June 2023 to undertake repair works within 3 – 6 months above classrooms and laboratories on the upper floor of Block A and the performing arts block. These spaces will need to be re-provided by September 2023 to enable a suitable approach to repair these areas safely. Alternative spaces have been identified to ensure adequate provision to teach the curriculum. However, assessment of these spaces has determined a number of condition and fire safety works required to ensure they are safe and suitable for use in September.

Lead member: Cabinet Member for Children, Schools, and Families

Lead director: Assistant Director for Schools and Learning

Contact: Director of Children's Services.