Issue history

Proposed introduction of • 9 new standard disabled bays • 2 relocations of existing dedicated disabled bay • 24 relocations of existing standard disabled bay • Removal of 8 dedicated disabled bays no longer required. Within batch ‘DPB-2023-05’ at 4