Valerie Okeyi, Principal Planning Officer,
introduced the report for retention and alteration of the Former
Lotus Motor Racing Car Factory, the demolition of all other
buildings and structures on site, and the construction of a
mixed-use development, comprising Purpose Built Student
Accommodation (PBSA) (Sui Generis), flexible industrial floorspace
(Classes E(g)(iii) and B8), and a café / community use
(Classes E, F1 and F2), alongside the delivery of a service road, a
landscaped public square, public realm improvements and ancillary
works.
The following was noted in response to
questions from the Committee:
- The applicant advised that car
ownership amongst students was expected to be very low. This
approach had been developed in consultation with Transport Officers
and the Greater London Authority (GLA). No student car ownership
was anticipated due to the site’s accessibility and
public transport connections.
- One parking space was proposed for
wheelchair users and accessible drop-off purposes. The
applicant stated that residents
would generally not be expected to own cars whilst
living in the development.
- In relation to affordable housing,
the applicant advised that 35% of the 518 purpose-built student
accommodation rooms would be provided at affordable rents in
accordance with GLA requirements, equating to approximately
181 rooms.
- Members noted that 10% of rooms
would be wheelchair accessible whilst only one Blue Badge parking
space was proposed. The applicant
acknowledged this and advised that the number
of accessible parking spaces would be reviewed further as
the proposal progressed.
- The
applicant advised that all its developments
typically included community space at ground-floor level. These
spaces were generally made available to community
interest companies (CICs) and charities either rent-free or at
heavily discounted rates.
- A community organisation had not yet
been identified for the space, although discussions with
potential operators were ongoing.
- The applicant advised that
the space would be available free of charge for community events at
certain times, with discounted rental arrangements applying at
other times.
- In relation to transport impacts,
the applicant confirmed that engagement had taken place with
Transport for London (TfL) during the pre-application process and
that further discussions would continue as the application
progressed.
- The applicant advised that
neighbouring buildings on the opposite side of the railway were
14 storeys in height, whereas the proposed
development would be 16 storeys, making it two storeys
taller.
- Secure cycle storage would be
provided to the rear of the workspace area, with separate and
secure access arrangements for students.
- The applicant advised that
London Plan policy allowed
developments retaining industrial capacity on industrial
sites to follow the Fast Track Route where 35% affordable housing
was provided. The GLA had agreed with the
applicant’s methodology during pre-application
discussions.
- As the proposal would aim
to meet the 35% affordable housing threshold, the
applicants considered that no viability assessment would
be required and the affordable provision would be secured
through a Section 106 Agreement.
- The applicant confirmed that
calculations relating to industrial capacity included the service
yard, which would be reserved solely for industrial users. This
approach had been discussed and agreed in principle with the GLA
during the pre-application process.
- The
applicant advised that a number of design
iterations had been undertaken with input from officers and the
Quality Review Panel (QRP), resulting in a significant reduction in
the perceived massing of the scheme.
- Further subdivision of the building
mass had been explored but would
have required additional cores and lift
infrastructure, increasing the overall bulk and complexity of the
development.
- The applicant
also stated that splitting the development
into additional buildings would increase the
wall-to-floor ratio and carbon footprint, making the proposed
arrangement the more sustainable option.
- In relation to industrial
reprovision, the applicant advised that GLA
policy required either the reprovision of existing
industrial floorspace or 65% plot ratio industrial capacity,
whichever was greater.
- The applicant advised that, in this
case, the 65% plot ratio requirement exceeded the existing
industrial floorspace and therefore formed the basis of the
proposal.
- Approximately 3,020 square metres of
industrial capacity would be reprovided through a
combination of industrial floorspace and the dedicated industrial
service yard.
- The applicant stated that
this approach had been adopted on a number of other
London schemes and was consistent with discussions held with the
GLA.
- In response to
comments regarding fenestration and design detailing, the
applicant agreed to review these matters further alongside other
design comments received.
- The applicant outlined a programme
of community engagement undertaken throughout the pre-application
process.
- Public exhibitions had been held in
January 2025 and June 2025, supported by the distribution of more
than 2,000 consultation leaflets to local residents and
businesses.
- The applicant reported positive
levels of attendance and engagement at both exhibitions.
- Feedback indicated strong
interest in the retention and celebration of the Lotus heritage
buildings and proposed public realm improvements.
- Whilst some concerns had been
raised regarding building height, the
applicant advised that residents generally
recognised the wider public benefits delivered by the scheme
once the proposals had been explained.
- The applicant confirmed that
engagement had taken place with a number
of local organisations, including representatives of the
Crouch End Festival and the Campsbourne Community
Collective.
- The applicant had
also facilitated temporary community use of the Little
Lotus building, including events relating to the history of
Lotus.
- Community groups had highlighted a
shortage of affordable community space within the local
area.
- The applicant committed to
supporting local employment opportunities during both the
construction and operational phases of the development.
- Employment and training obligations
would be secured through a Section 106 Agreement to maximise
opportunities for local residents and
businesses.
- It was noted that a date for the
next Quality Review Panel (QRP) meeting had not yet been
confirmed.
- The Head
of Development Management confirmed back to
Members a summary of the main comments they had
made to ensure a clear understanding.