Valerie Okeiyi, Principal Planning Officer,
introduced the report for the item. This was a full Planning
Application seeking consent for the demolition of existing
buildings to deliver a new development comprising 150 new council
homes (Use Class C3) and flexible workspace (Use Class E), by way
of erection of a 22 storey building with 8 storey wing, and a 14
storey building with 6 storey wing; alongside public realm
improvements, soft and hard landscaping, cycle parking, blue badge
parking, servicing and delivery details and refuse and recycling
provision.
The following was noted in response to
questions from the committee:
- Conditions 12 and 13 were removed in
the addendum as follow-up comments had been received from the Flood
Officer since the publication of the agenda. The Flood Officer had
confirmed that the additional information submitted was acceptable
and had signed it off.
- Members
highlighted that any measures which could improve pedestrian safety
through clearer designation should be considered, and this was
noted for any future scheme design
- It was noted that it was not unusual
for a scheme to be recommended for approval while consultation
responses from one or two non-statutory consultees were still
outstanding, subject to them not raising any material
considerations not already considered and addressed by officers;
particularly given that the application was subject to a Stage 2
referral to the Mayor and a Director’s Letter; so any
decision notice would not be issued for some time. . Officers explained that the remaining consultee
had not initially been consulted and officers wished to ensure they
were given the opportunity to comment.
- Cllr Brennan declared an interest as
a member of the Statutory Advisory Committee.
- In relation to accessible car
parking provision, officers explained that they had sought to
maximise provision as close to the site as possible, resulting in
12 identified spaces. A Car Parking Management Plan had been
secured by condition, which allowed for provision to increase to 15
spaces if required, with additional spaces to be identified on the
highway should demand arise.
- It was confirmed that there was no
direct pedestrian crossing associated with this application.
However, crossings were being considered as part of the wider
masterplan area to improve access to Alexandra Palace. Additional
works were also planned to improve access towards Cross Lane via
the tunnel, which was expected to be brought forward as part of a
separate scheme. Officers had secured a financial contribution
towards public realm enhancements, which could be used to support
crossing improvements.
- It was noted that Section 106
contributions and Community Infrastructure Levy funding could, in
principle, be used on projects delivered in partnership with the
Alexandra Park and Palace Trust.
- Members noted that the development
would sit in the context of the already approved taller buildings
forming part of the Alexandra Gate development (formerly Clarendon
Square). In this context, the proposal was considered modest and
would sit in the foreground of those taller buildings. Neither
would the scheme negatively impact on views of Alexadra Palace or
adversely breach the skyline.
- The Committee noted that the
proposal had been brought forward by the Council on Council-owned
land and sought to maximise the delivery of affordable housing to
meet significant housing need within the borough. While other
nearby schemes included a mix of affordable and market housing,
this scheme focused on maximising affordable provision for local
people in housing need.
- It was confirmed that the scheme
would comply with the requirements of the Neighbourhood Moves
scheme, enabling qualifying tenants from nearby estates to apply.
In addition, applications would be accepted from households on the
housing waiting list and those in temporary accommodation. Officers
expressed the expectation that a balanced and successful mix of
tenancies would be achieved, consistent with other recent Council
schemes, including Wingspan Walk.
- Members noted that it would be
helpful for future committee reports to specify the number of homes
with kitchen-diners and the number with separate kitchens.
- Officers explained that, based on
experience and resident preferences, family homes (three bedrooms
and above) were typically designed with separate kitchen-diners,
while smaller units tended to be open plan with a
living/kitchen/diner all in one. This approach allows better
supervision of children in smaller households and provides greater
separation for larger households and was consistent with the
Council’s Estate Regeneration Standards.
- Cllr Ibrahim requested that it be
formally minuted that she objected to the use of the term
“foreigner” by any Member.
- In relation to open space provision,
officers explained that there was limited roof space and that the
scheme sought to balance the provision of play and social space
along with providing green roofs to maximise biodiversity net
gain.
- Officers advised that more
substantial planting would require increased soil depth, which had
structural implications. This was one of the reasons for the chosen
planting strategy, as it required relatively shallow soil
depths.
- Members expressed hope that
residents would be encouraged to plant on their balconies.
- It was confirmed that details of
landscaping and long-term management (including irrigation) had
been secured by condition. The green roofs would be required to
meet both biodiversity net gain requirements and the Urban Greening
Factor.
- Officers advised that the design of
the relative locations of the proposed buildings responds to the
Crossrail safeguarding at this location. The design of the proposed
colonnaded frontage was welcomed
- Officers explained that the unit mix
was strongly influenced by the Council’s housing needs
assessment. While there remained significant demand for one-bedroom
homes, 99 of the 150 proposed homes were larger, comprising
two, three and four
bedroom homes.
- Members were informed of work
undertaken at Wingspan Walk, where a block of one-bedroom homes had
been offered to older residents to encourage downsizing. Officers
noted the very high take-up and that most residents had expressed a
preference for higher floors, due to a combination of security and
views. It was noted that similarly high-quality views would be
available from this scheme.
- It was confirmed that one-bedroom
homes would be located from the second floor upwards, with access
to the podium.
- Officers reiterated that long-term
sustainability was embedded throughout the scheme design, including
consideration of ongoing maintenance of green spaces. As part of
the sustainable drainage strategy, attenuation tanks would be
provided within the scheme.
The Chair asked Catherine Smyth, Head of
Development Management and Planning Enforcement to sum up the
recommendation as set out in the report. The Chair moved that the
recommendation be approved following a vote of 7 in favour, 0
abstentions and 0 objections.
RESOLVED
2.1 That the Committee authorise the Head of
Development Management or the Director of Planning and Building
Standards to GRANT planning permission subject to the conditions
and informatives set out below and the completion of an agreement
satisfactory to the Head of Development Management or the Director
of Planning and Building Standards that secures the obligations set
out in the Heads of Terms below, and subject to referral to the
Mayor of London and any direction they make.
2.2 That delegated authority be granted to the
Head of Development Management or the Director of Planning and
Building Standards to make any alterations, additions or deletions
to the recommended measures and/or recommended conditions as set
out in this report and to further delegate this power provided this
authority shall be exercised in consultation with the Chair (or in
their absence the Vice-Chair) of the Sub-Committee.
2.3 That the agreement referred to in
resolution (2.1) above is to be completed no later than 28 April
2026 within such extended time as the Head of Development
Management or the Director of Planning & Building Standards
shall in their sole discretion allow; and
2.4 That, following completion of the
agreement(s) referred to in resolution (2.1) within the time period
provided for in resolution (2.3) above, planning permission be
granted in accordance with the Planning Application subject to the
attachment of the conditions.
Conditions/Informative Summary – (the
full text of recommended conditions/informative is contained in
Appendix 2 of the report.)
Conditions
1. Time Limit (Compliance)
2. Approved plans and documents
(Compliance)
3. Materials and detailing (Prior to
commencement)
4. Boundary Treatment and access control
(Pre-occupation)
5. Landscaping (Prior to commencement of
relevant part)
6. Play equipment
7. Biodiversity Net Gain Plan
(Pre-occupation)
8. BNG Monitoring (Pre-occupation)
9. Lighting (Pre-occupation)
10.Noise from building services plant and
vents (Compliance)
11.Secure by Design Accreditation (Pre-above
ground works)
12.Secure by Design Certification
(Pre-occupation)
13.Flood & Water Lead - Surface Water
Drainage (Pre-commencement) removed via addendum
14.Flood & Water Lead - SuDS management
and Maintenance Strategy (Preoccupation) removed via addendum
15.Thames Water - Piling Method Statement
(Pre-commencement)
16.Crossrail 2 - Detailed Design and Method
Statement
17.Land Contamination (Pre-commencement)
18.Unexpected contamination (if
identified)
19.NRMM (Pre-commencement)
20.Management and Control of Dust
(Pre-commencement)
21.Delivery and Servicing Management Plan
(Pre-occupation)
22.Considerate Constructors (Compliance)
23.Energy Strategy (Pre-above ground
works)
24.Sustainability Review
25.Be Seen
26.Overheating (Pre-above ground works)
27.Building use guide
28.Sustainability Standards for
non-residential units
29.Living Roofs (Pre-above ground works)
30.Climate Change adaption
31.Circular Economy (Pre-Construction report,
Post Completion report)
32.Whole Life Carbon
33.Urban Green Factor (Compliance)
34.Arboricultural Method Statement
(Compliance)
35.Cycle Parking (Pre-occupation) – ref
the external short stay storage
36.Accessible Parking Bay(s)
(Pre-commencement)
37.Waste/Recycling Storage (Prior to
commencement of relevant part)
38.Restriction to Telecommunications Apparatus
(Restriction)
39.Building Regulations Part M
(Compliance)
40.Communal antennae
41.Commercial Units – Hours of
operation
42.Commercial Shopfront
43.Restriction to Use Class
44.Architect Retention
45.Air Quality Neutral
46.Internal Playspace
47. Revised Wind Assessment (prior to
superstructure works) as per the addendum
A summary of the recommended informatives for
the development is provided below:
Informatives Summary – (the full text of
Informatives is contained in appendix to the report).
Informatives
1) Positive and Proactive
2) Directors Agreement Letter
3) CIL
4) Land Ownership
5) Party Wall Act
6) Hours of Construction
7) Street Numbering/Naming
8) Asbestos
9) Metropolitan Police Service Designing Out
Crime
10) Crossrail 2
11) Thames Water
12) Thames Water
13) Water Consumption