Proposal: Demolition of existing structures and erection of two buildings to provide residential units and Class E floorspace; and provision of associated landscaping, a new pedestrian route, car and cycle parking, and refuse and recycling facilities.
Minutes:
Valerie Okeiyi, planning officer, introduced the report fordemolition of existing structures and erection of two buildings to provide residential units and Class E floorspace; and provision of associated landscaping, a new pedestrian route, car and cycle parking, and refuse and recycling facilities.
The following was noted in response to questions from the committee:
Marcus Ballard represented Parkside Malvern Residents Association. He attended the committee and spoke in objection of the proposal, a summary of his speech is below:
In his view there was unsafe and insufficient site access orientated away from SA21 Clarendon Gateway, the ‘central’ metropolitan area and Western Heartlands and a failure to respect the Blue Ribbon and integrate the Moselle Brook into the
development and SA21.
John Miles, resident of Hornsey Park Road attended the committee and spoke in objection of the proposal, a summary of his speech is below:
He raised concerns around the limitations to residents’ view, he noted that they already had limited views due to the shopping mall. In his view there was not a sensible case for 4 and 6 storey dwellings behind the back gardens of neighbours and the impact on biodiversity would be slight.
The following was noted in response to questions to the objectors:
Steve Daley responded to the objectors on behalf of the applicant:
The SA21, as was pointed out by the officers involved three sites, their sites, the Iceland site and that on Brook Rd. As part of the application, the team looked at a wider master plan of how the commercial space could be incorporated within the schemes given that the Iceland site had already been consented. There was a desire and requirement to provide a public route from Hornsey Park Rd through to Brook Rd. There was the question about the commercial space on Hornsey Park Road and it was suggested that it would be fitting for a small office, due to this there was not an anticipation of a great deal of deliveries to a unit of that size. There was a construction management plan which was a condition.
The following was noted in response to questions to the applicant:
The Chair asked Kevin Tohill, Interim Head of Development Management and Enforcement
Planning to sum up the recommendations as set out in the report. The Chair moved that the
recommendation be approved following a unanimous decision.
the Assistant Director Planning, Building Standards and Sustainability to make any
alterations, additions or deletions to the recommended measures and/or
recommended conditions as set out in this report and to further delegate this power
provided this authority shall be exercised in consultation with the Chair (or in their
absence the Vice-Chair) of the Sub-Committee.
than 07/02/2025 within such extended time as the Head of Development Management or the Assistant Director Planning, Building Standards & Sustainability shall in their sole discretion allow; and
Conditions/Informative Summary - Planning Application HGY/2024/0466 (the
full text of recommended conditions/informative is contained in Appendix 2 of the
report.
Conditions
1. Time limit
2. Approved Plans and Documents
3. Materials
4. Boundary treatment and access control
5. Landscaping
6. Lighting
7. Site levels
8. Secure by design accreditation
9. Secure by design certification
10. Land contamination
11. Unexpected Contamination
12. NRMM
13. Demolition/Construction Environmental Management Plan
14. Arboricultural Impact Assessment
15. Delivery and Servicing Plan
16. Cycle Parking
17. Electric Vehicle Charging Points
18. Wheelchair accessible car parking spaces
19. Car parking Management Plan
20. Post-development culvert condition survey
21. Remediation Strategy
22. Investigative Boreholes
23. Verification Report
24. Infiltration Drainage
25. Piling
26. Surface Water Drainage
27. Management and Maintenance
28. Crossrail 2
29. Satellite Antenna
30. Restriction to Telecommunications apparatus
31. Architect Retention
32. Wheelchair Accessible Dwellings
33. Commercial Units – Noise Attenuation
34. Restriction to Use Class
35. Energy Strategy
36. DEN Connection
37. Overheating
38. Living Roof
39. Biodiversity
Informatives
1) Co-operation
2) CIL liable
3) Hours of construction
4) Party Wall Act
5) Street Numbering
6) Sprinklers
7) Water pressure
8) Thames Water Groundwater Risk Management Permit
9) Thames Water Underground Wastewater Asset
10) Asbestos
11) Flood Risk Activity Permit
12) Secure by design
13) Crossrail 2
14) Water Consumption