Agenda item

Lock up Garages Cline Road N11 2NE

Demolition of existing lock-up garages and construction of 9 residential units (comprising 6 x 4 bed town houses, 2 x 2 bed flats, and 1 x 1 bed flat) and 87.9sq metres of commercial floor area with associated access road, parking areas and cycle stores.

 

RECOMMENDATION: grant permission subject to conditions and subject to a s106 Legal Agreement

Minutes:

The Committee considered a report on the application to grant planning permission for the demolition of the existing lock-up garages and construction of 9 residential units (comprising 6 x 4 bed town houses, 2 x 2 bed flats, and 1 x 1 bed flat) and 87.9sq metres of commercial floor area with associated access road, parking areas and cycle stores. The report set out details of the proposal, the site and surroundings, planning history, relevant planning policy, consultation and responses, analysis, equalities and human rights implications and recommended to grant permission subject to conditions and subject to a s106 Legal Agreement.

 

The planning officer gave a short presentation highlighting the key aspects of the report. The attention of the Committee was drawn to a tabled addendum setting out an additional condition imposing restrictions on the installation of satellite antennas and a correction to the CIL charges.

 

In response to questions from the Committee, officers confirmed that the flats were all dual aspect and that the proposed ridge height was inline with properties on Torrington Gardens.

 

Clarification was sought as to whether Homes for Haringey had been approached regarding potentially managing affordable housing provision onsite. Officers advised that they were working with Homes for Haringey to find a suitable scheme where this could be achieved but that this needed to be planned in at an early stage, and as such had not been feasible for the current scheme.

 

The Chair moved the recommendation of the report and it was

 

RESOLVED

·         That planning application HGY/2016/0558 be approved and that the Head of Development Management is authorised to issue the planning permission and impose conditions and informatives subject to the signing of a s106 Legal Agreement providing for the obligation set out in the Heads of Terms.

 

·         That the s106 Legal Agreement referred to above is to be completed no later than 31/10/2016 or within such extended time as the Head of Development Management or the Assistant Director Planning shall in her/his sole discretion allow; and

 

·         That, following completion of the s106 agreement within the time period provided for above, planning permission be granted in accordance with the Planning Application subject to the attachment of the conditions.

 

·         That delegated authority be granted to the Director/Assistant Director - Planning to make any alterations, additions or deletions to the recommended heads of terms and/or recommended conditions as set out in the officer report (and to authorise any such changes requested by the GLA) and to further sub-delegate this power provided this authority shall be exercised in consultation with the Chairman (or in their absence the Vice-Chairman) of the Sub-Committee.

 

1.            The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect.

Reason: This condition is imposed by virtue of the provisions of the Town and Country Planning Act 1990 and to prevent the accumulation of unimplemented planning permissions.

 

2.            Notwithstanding the information submitted with the application, the development hereby permitted shall only be built in accordance with the following approved plans: 

PAR-199-SUR-001, Lifetime Homes Assessment, Ecology Appraisal, Transport Statement v2, Planning Statement, Viability Report, 1341/1, GS-2440995 Radon Report, GS-2440996 Site Contamination Report, GS-2440997 small scale report and GS 2440997 large scale report received 15/02/16, PAR-199-PA-102B Drainaged Sustainability Report Rev B and Air Quality Report received 01/06/16, Energy Statement Rev A received 26/06/16, and PAR-199-PA-101E, PAR-199-PA-100D and PAR-199-PA-001D received 11/07/16

Reason:  To avoid doubt and in the interests of good planning.

 

3.            Prior to commencement, a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) shall be submitted to, approved in writing by the Local planning Authority and implemented accordingly thereafter. The Plans should provide details on how construction work would be undertaken in a manner that disruption to traffic and pedestrians on Cline Road and the roads surrounding the site is minimised.  The construction vehicle movements shall be carefully planned and co-ordinated to avoid the AM and PM peak periods.

Reason: To reduce congestion and mitigate any obstruction to the flow of traffic on the transportation network.

 

4.            Before development commences other than for investigative work:

a)        A desktop study shall be carried out which shall include the identification of previous uses, potential contaminants that might be expected, given those uses, and other relevant information. Using this information, a diagrammatical representation (Conceptual Model) for the site of all potential contaminant sources, pathways and receptors shall be produced. The desktop study and Conceptual Model shall be submitted to the Local Planning Authority. If the desktop study and Conceptual Model indicate no risk of harm, development shall not commence until approved in writing by the Local Planning Authority.

 

b)        If the desktop study and Conceptual Model indicate any risk of harm, a site investigation shall be designed for the site using information obtained from the desktop study and Conceptual Model. This shall be submitted to, and approved in writing by, the Local Planning Authority prior to that investigation being carried out on site. The investigation must be comprehensive enough to enable:-

·                     a risk assessment to be undertaken,

·                     refinement of the Conceptual Model, and

·                    the development of a Method Statement detailing the remediation requirements.

The risk assessment and refined Conceptual Model shall be submitted, along with the site investigation report, to the Local Planning Authority for written approval.

 

c)         If the risk assessment and refined Conceptual Model indicate any risk of harm, a Method Statement detailing the remediation requirements, using the information obtained from the site investigation, and also detailing any post remedial monitoring shall be submitted to, and approved in writing by, the Local Planning Authority prior to that remediation being carried out on site.

 

Where remediation of contamination on the site is required completion of the remediation detailed in the method statement shall be carried out and a report that provides verification that the required works have been carried out, shall be submitted to, and approved in writing by the Local Planning Authority, before the development is occupied.

Reason: To ensure the development can be implemented and occupied with adequate regard for environmental and public safety in accordance with Policy 5.21 of the London Plan 2015 and Saved Policy UD3 of the Haringey UDP.

 

5.            Where remediation of contamination on the site is required completion of the remediation detailed in the method statement shall be carried out and a report that provides verification that the required works have been carried out, shall be submitted to, and approved in writing by the Local Planning Authority, before the development is occupied.

Reason: To ensure the development can be implemented and occupied with adequate regard for environmental and public safety in accordance with Policy 5.21 of the London Plan 2015 and Saved Policy UD3 of the Haringey Unitary Development Plan.

 

6.            No impact piling shall take place until a piling method statement (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) has been submitted to and approved in writing by the local planning authority in consultation with Thames Water. Any piling must be undertaken in accordance with the terms of the approved piling method statement.

Reason: The proposed works will be in close proximity to underground sewerage utility infrastructure. Piling has the potential to impact on local underground sewerage utility infrastructure. The applicant is advised to contact Thames Water Developer Services on 0800 009 3921 to discuss the details of the piling method statement.

 

7.            No works shall be carried out on the site until a Dust Management Plan (DMP), detailed the management of demolition and construction dust, has been submitted and approved by the LPA and thereafter the development shall only be implemented and carried out in accordance with the approved DMP.

Reason: As required by the London Plan 2015 Policy 7.14.

 

8.            Prior to the commencement of any works the site or Contractor Company is to register with the Considerate Constructors Scheme. Proof of registration must be sent to the LPA.

Reason: As required by the London Plan 2015 Policy 7.14.

 

9.            Prior to installation details of the gas boilers to be provided for space heating and domestic hot water should be forwarded to the Local Planning Authority. The boilers to be provided for space heating and domestic hot water shall have dry Nox emissions not exceeding 40 mg/kWh (0%).

Reason: As required by London Plan 2015 Policy 7.14.

 

10.         The development hereby permitted shall be built in accordance with the approved renewable energy statement and the energy provision shall be thereafter retained in perpetuity unless agreed in writing by the Local Planning Authority.

Reason: To ensure that a proportion of the energy requirement of the development is produced by on-site renewable energy sources to comply with Policy 5.7 of the London Plan 2015, emerging Policy DM21 of the DM,DMP (pre-submission version January 2016), and Policies SP0 and SP4 of the Local Plan 2013.

 

11.         Details of a scheme for the storage and collection of refuse from the herby approved commercial unit shall be submitted to and approved by the Local Planning Authority prior to the commencement of the use. The approved scheme shall be implemented and permanently retained to the satisfaction of the Local Planning Authority prior to the commencement of the commercial use. 

Reason: In order to protect the amenities of the locality and to comply with Saved Policy UD7 of the Haringey UDP 2006 and Policy 5.17 of the London Plan 2015.

 

12.         No development shall take place until a detailed surface water drainage scheme for Site, which is based on sustainable drainage principles and an assessment of the hydrological and hydro-geological context of the development, has been submitted to and approved in writing by the local planning authority. The drainage strategy should demonstrate the surface water run-off generated up to and including the 1 in 100 year plus 40% for climate change critical storm will not exceed the run-off from the undeveloped site following the corresponding rainfall event. The scheme shall include details of its maintenance and management after completion and shall subsequently be implemented in accordance with the approved details before the development on Site is occupied.

Reason: Mechanism for the detailed drainage proposals to be approved as the scheme is developed.

 

13.         No construction works (excluding demolition) shall commence until further details of the design methodology, implementation, maintenance and management of the sustainable drainage scheme have been submitted & approved in writing by the Local planning Authority. Details shall include:-

(a) Methodology and reasoning for SuDS flows and volumes proforma determination enabling full assessment that the allowable thresholds have been achieved have been submitted to and approved in writing by the Local Planning Authority.

(b) Management and maintenance plan for the lifetime of the development, management by Residents Management Company or other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime a scheme of surface water drainage works including an appropriate maintenance regime have been submitted to and approved in writing by the Local Planning Authority. The sustainable drainage scheme shall be constructed in accordance with the approved details and thereafter retained.

Reason: To promote a sustainable development consistent with Policies SP0, SP4 and SP6 of the Haringey Local Plan 2013 and emerging Policy DM25 of the DM,DMP (pre-submission version January 2016).

 

14.         Notwithstanding the information submitted with this application, no development shall take place until precise details of the external materials to be used in connection with the development hereby permitted be submitted to, approved in writing by and implemented in accordance with the requirements of the Local Planning Authority and retained as such in perpetuity.

Reason: In order to retain control over the external appearance of the development in the interest of the visual amenity of the area and consistent with Policy SP11 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey UDP 2006.

 

15.         Details of the proposed boundary treatment shall be submitted to and approved by the Local Planning Authority prior to the commencement of the development. The approved boundary treatment shall thereafter be installed prior to occupation of any new residential unit.

Reason: In the interest of the visual amenity of the area and residential amenities of neighbouring occupiers.

 

16.         Details of a scheme depicting those areas to be treated by of hard and soft landscaping shall be submitted to, approved in writing by the Local Planning Authority and thereafter implemented in accordance with the approved details. Any trees which die within a period of 5 years from the completion of the development; are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.

Reason: In order to provide a suitable setting for the proposed development in the interests of visual amenity of the area.

 

17.         The cycle parking facilities shown on the approved plans shall be provided prior to first occupation of the dwellings hereby approved and permanently retained thereafter to the satisfaction of the Local Planning Authority.

Reason: To promote sustainable modes of transport in accordance with Policies 6.1 and 6.9 of the London Plan 2015 and Policy SP7 of the Haringey Local Plan 2013.

 

18.         Prior to first occupation of the development, hereby approved, a survey report on the electricity sub-station shall be submitted to and approved in writing by the Local Planning Authority. The report shall include an assessment of the associated electromagnetic field and noise generated by the sub-station, by reference to relevant standards Planning Officer Delegated Report and studies, and any mitigation measures that may be required. Thereafter all works shall be carried out in accordance with the details approved.

Reason: To ensure the development can be implemented and occupied with adequate regard for environmental and public safety in accordance with Policy 5.21 of the London Plan 2015 and Saved Policy UD3 of the Haringey UDP.

 

19.         Notwithstanding the provisions of the the Town and Country Planning (General Permitted Development) (England) Order 2015, or any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order, the commercial unit shall be used as a B1 business use only and shall not be used for any other purpose unless approval is obtained to a variation of this condition through the submission of a planning application.

Reason: In order to restrict the use of the premises to one compatible with the surrounding area because other uses within the same Use Class or another Use Class are not necessarily considered to be acceptable consistent with Saved Policy UD3 of the Haringey UDP 2006.

 

20.         Notwithstanding the provisions of the the Town and Country Planning (General Permitted Development) (England) Order 2015 or any Order revoking or re-enacting that Order, no roof extensions, or rear extensions shall be carried out without the grant of planning permission having first been obtained from the Local Planning Authority.

Reason: To safeguard the visual amenities of the area and to prevent overdevelopment of the site by controlling proposed extensions and alterations consistent with Policy 7.4 of the London Plan 2015 and Saved Policy UD3 of the Haringey UDP 2006.

 

21.         The development hereby permitted shall not be occupied until such time as the existing crossover has been removed and the footway reconstructed.  The necessary works to re-construct the footways will be carried out by the Council at the applicant's expense once all the necessary internal site works have been completed.

Reason: To safeguard the integrity of the local highways network, facilitate travel by sustainable mode of transport in particular by pedestrians.

 

22.         All residential units within the proposed development shall be designed to Part M4 (2) 'accessible and adaptable dwellings' of the Building Regulations 2010 (as amended) (formerly Lifetime Homes Standard) unless otherwise agreed in writing with the Local Planning Authority.

 Reason: To ensure that the proposed development meets the Council's Standards in relation to the provision of wheelchair accessible homes and to comply with Haringey Local Plan 2013 Policy SP2 and the London Plan 2015 Policy 3.8. 

 

INFORMATIVE : In dealing with this application, Haringey Council has implemented the requirements of the National Planning Policy Framework and of the Town and Country Planning (Development Management Procedure) (England) (Amendment No.2) Order 2012 to foster the delivery of sustainable development in a positive and proactive manner.

 

INFORMATIVE: Land Ownership

The applicant is advised that this planning permission does not convey the right to enter onto or build on land not within his ownership.

 

INFORMATIVE: Hours of Construction Work

The applicant is advised that under the Control of Pollution Act 1974, construction work which will be audible at the site boundary will be restricted to the following hours:-

                                           8.00am - 6.00pm                       Monday to Friday

                                           8.00am - 1.00pm                                      Saturday

                                           and not at all on Sundays and Bank Holidays.

 

INFORMATIVE: Party Wall Act

The applicant's attention is drawn to the Party Wall Act 1996 which sets out requirements for notice to be given to relevant adjoining owners of intended works on a shared wall, on a boundary or if excavations are to be carried out near a neighbouring building.

 

INFORMATIVE : Community Infrastructure Levy

The applicant is advised that the proposed development will be liable for the Mayor of London and Haringey CIL.  Based on the information given on the plans, the Mayor's CIL charge will be £39,550.00 (1,130m2 x £35 as up-rated for inflation x 1.229) and the Haringey CIL charge will be £186,450.00 (1,130m2 x £165 as up-rated for inflation x 1.054. This will be collected by Haringey after the scheme is implemented and could be subject to surcharges for failure to assume liability, for failure to submit a commencement notice and/or for late payment, and subject to indexation in line with the construction costs index.

 

INFORMATIVE: The new development will require numbering. The applicant should contact the Local Land Charges team at least six weeks before the development is occupied (tel. 020 8489 5573) to arrange for the allocation of a suitable address.

 

INFORMATIVE : The London Fire Brigade strongly recommends that sprinklers are considered for new developments and major alterations to existing premises, particularly where the proposals relate to schools and care homes. Sprinkler systems installed in buildings can significantly reduce the damage caused by fire and the consequential cost to businesses and housing providers, and can reduce the risk to life. The Brigade opinion is that there are opportunities for developers and building owners to install sprinkler systems in order to save money, save property and protect the lives of occupier.

 

INFORMATIVE :With regards to surface water drainage, it is the responsibility of a developer to make proper provision for drainage to ground, water course, or a suitable sewer. In respect of surface water, it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage.  When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary.  Connections are not permitted for the removal of groundwater.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required.  They can be contacted on 0845 850 2777.

 

INFORMATIVE: Legal changes under The Water Industry (Scheme for the Adoption of private sewers) Regulations 2011 mean that the sections of pipes you share with your neighbours, or are situated outside of your property boundary which connect to a public sewer are likely to have transferred to Thames Water’s ownership. Should your proposed building work fall within 3 metres of these pipes we recommend you contact Thames Water to discuss their status in more detail and to determine if a building over / near to agreement is required. You can contact Thames Water on 0800 009 3921 or for more information please visit our website at www.thameswater.co.uk

 

INFORMATIVE: A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer.  Permit enquiries should be directed to Thames Water’s Risk Management Team by telephoning 02035779483 or by emailing wwqriskmanagement@thameswater.co.uk. Application forms should be completed on line via www.thameswater.co.uk/wastewaterquality.”

 

INFORMATIVE: Thames Water will aim to provide customers with a minimum pressure of 10m head (approx 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Waters pipes. The developer should take account of this minimum pressure in the design of the proposed development.

 

INFORMATIVE: Prior to demolition of existing buildings, an asbestos survey should be carried out to identify the location and type of asbestos containing materials.  Any asbestos containing materials must be removed and disposed of in accordance with the correct procedure prior to any demolition or construction works carried out.

 

Supporting documents: