Agenda item

168 Park View Road, London N17 9BL

Demolition of existing car repair/servicing garage and construction of a part 2 and part 4 storey building to provide 12 residential units with 7 car parking spaces and ancillary servicing accommodation.

 

RECOMMENDATION: grant permission subject to conditions and subject to a S106 Legal Agreement

 

Minutes:

The Committee considered a report on an application to grant planning permission for the demolition of existing car repair/servicing garage and construction of a part 2 and part 4 storey building to provide 12 residential units with 7 car parking spaces and ancillary servicing accommodation. The report set out details of the proposal, the site and surroundings, planning history, relevant planning policy, consultation and responses, analysis, equalities and human rights implications and recommended to grant permission subject to conditions and subject to a s106 Legal Agreement.

 

The planning officer gave a short presentation highlighting the key aspects of the report.

 

The Committee raised the following points in discussion of the application:

·         Assurances were sought over the close proximity of the site to the adjacent railway line and how any associated noise and vibration issues would be managed. Officers advised that Network Rail had been consulted and had raised no objections to the application. The applicant confirmed that the scheme complied with Network Rail’s guidelines in terms of the distance of the building from the track and overhead cables. Design measures to reduce any noise impact would include attenuated windows and careful layout plans such as facing units away from the railway line. Any vibration issues would be mitigated through the structural design of the foundations. 

·         An explanation was sought as to why the scheme exceeded London Plan density guidelines. Officers identified that the current Public Transport Accessibility Level (PTAL) score did not take into account the shorter public right of way access route via Ashley Road. Security improvements to this route under the scheme would increase the PTAL rating to 4 rendering it able to support a slightly higher density scheme. 

·         Clarification was sought on the final CIL contribution, with a variation in figures provided within the officer report. Officers advised that the calculation set out in section 7 of the report was the correct amount.

·         The Committee questioned whether improvements would be made to the subway underpass which had limited headroom and suffered from poor drainage. The transport officer advised that structural changes to the underpass would constitute a significant and challenging engineering project and as such very expensive. Under this application, improvements would be made to both approaches to the underpass and to its drainage. Further improvements were planned to the footpath and underpass within the wider Tottenham regeneration masterplan and which would be coming forward in due time. 

·         Clarification was sought on allocation of the 5 parking spaces planned onsite. The applicant advised that priority would be given to the wheelchair accessible units followed by the larger family units.

 

The Chair moved the recommendation of the report and it was

 

RESOLVED

  • That planning application HGY/2015/3398 be approved subject to conditions and subject to a s106 Legal Agreement.

 

1.         The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect.

Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions.

 

2.         The development hereby authorised shall be carried out in accordance with the following approved plans and specifications:

Reason: In order to avoid doubt and in the interests of good planning.

 

3.         The applicant/ Developer are required to submit a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) for the local authority's approval 1 month (one month) prior to construction work commencing on site. The Plans should provide details on how construction work (inc. Demolition) would be undertaken taken in a manner that disruption to traffic and pedestrians on Lordship Lane and the roads surrounding the site is minimised.  The construction management plan must include details on the construction of the development and of the development in a way such that the Councils depot will always have unrestricted access. It is also requested that construction vehicle movements should be carefully planned and coordinated to avoid the AM and PM peak periods.

Reason: To reduce congestion and mitigate any obstruction to the flow of traffic on the transportation network.

 

4.         Before development commences other than for investigative work:

a) A desktop study shall be carried out which shall include the identification of previous uses, potential contaminants that might be expected, given those uses, and other relevant information. Using this information, a diagrammatical representation (Conceptual Model) for the site of all potential contaminant sources, pathways and receptors shall be produced.  The desktop study and Conceptual Model shall be submitted to the Local Planning Authority. If the desktop study and Conceptual Model indicate no risk of harm, development shall not commence until approved in writing by the Local Planning Authority.

b)         If the desktop study and Conceptual Model indicate any risk of harm, a site investigation shall be designed for the site using information obtained from the desktop study and Conceptual Model. This shall be submitted to, and approved in writing by, the Local Planning Authority prior to that investigation being carried out on site.  The investigation must be comprehensive enough to enable:-

"           a risk assessment to be undertaken,

"           refinement of the Conceptual Model, and

"           the development of a Method Statement detailing the remediation requirements.

The risk assessment and refined Conceptual Model shall be submitted, along with the site investigation report, to the Local Planning Authority for written approval.

 

c)    If the risk assessment and refined Conceptual Model indicate any risk of harm, a Method Statement detailing the remediation requirements, using the information obtained from the site investigation, and also detailing any post remedial monitoring shall be submitted to, and approved in writing by, the Local Planning Authority prior to that remediation being carried out on site.

Where remediation of contamination on the site is required completion of the remediation detailed in the method statement shall be carried out and a report that provides verification that the required works have been carried out, shall be submitted to, and approved in writing by the Local Planning Authority, before the development is occupied.

Reason: To ensure the development can be implemented and occupied with adequate regard for environmental and public safety in accordance with Policy 5.21 of the London Plan 2011 and Saved Policy UD3 of the Haringey Unitary Development Plan.

 

5.         Where remediation of contamination on the site is required completion of the remediation detailed in the method statement shall be carried out and a report that provides verification that the required works have been carried out, shall be submitted to, and approved in writing by the Local Planning Authority, before the development is occupied.

Reason: To ensure the development can be implemented and occupied with adequate regard for environmental and public safety in accordance with Policy 5.21 of the London Plan 2011 and Saved Policy UD3 of the Haringey Unitary Development Plan.

 

6.         No works shall be carried out on the site until a detailed report, including Risk Assessment, detailing management of demolition and construction dust has been submitted and approved by the LPA with reference to the GLA's SPG Control of Dust and Emissions during Construction and Demolition.  All demolition and construction contractors and Companies working on the site must be registered with the Considerate Constructors Scheme.  Proof of registration must be sent to the LPA prior to any works being carried out on the site.

 

7.         Prior to installation details of the gas boilers to be provided for space heating and domestic hot water should be forwarded to the Local Planning Authority. The boilers to be provided for space heating and domestic hot water shall have dry Nox emissions not exceeding 20 mg/kWh (0%).

Reason: As required by The London Plan Policy 7.14.

 

8.         No impact piling shall take place until a piling method statement (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) has been submitted to and approved in writing by the local planning authority in consultation with Thames Water.  Any piling must be undertaken in accordance with the terms of the approved piling method statement.

Reason: The proposed works will be in close proximity to underground sewerage utility infrastructure.  Piling has the potential to impact on local underground sewerage utility infrastructure. The applicant is advised to contact Thames Water Developer Services on 0800 009 3921 to discuss the details of the piling method statement.

 

9.         An approved renewable energy statement shall be submitted prior to commencement of works above ground and the energy provision shall be thereafter retained in perpetuity without the prior approval, in writing, of the Local Planning Authority.  The energy statement must demonstrate how the development will be designed to allow for connection to a District Energy network should it come forward in the future.

Reason:  To ensure that a proportion of the energy requirement of the development is produced by on-site renewable energy sources to comply with Policy 5.7 of the London Plan 2011 and Policies SP0 and SP4 of the Haringey Local Plan 2013.

 

10.       Details of a scheme for the storage and collection of refuse from the premises shall be submitted to and approved by the Local Planning Authority prior to the commencement of the use. The approved scheme shall be implemented and permanently retained to the satisfaction of the Local Planning Authority.

Reason: In order to protect the amenities of the locality and to comply with Saved Policy UD7 of the Haringey Unitary Development Plan 2006 and Policy 5.17 of the London Plan 2011.

 

11.       No construction works (excluding demolition) shall commence until further details of the design implementation, maintenance and management of the sustainable drainage scheme have been submitted & approved in writing by the Local planning Authority. Details shall include:-

(a) Details of an emergency plan should the pumps fail.

(b) Management and maintenance plan for the lifetime of the development, management by Residents

Management Company or other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime a scheme of surface water drainage works including an appropriate maintenance regime have been submitted to and approved in writing by the Local Planning Authority. The sustainable drainage scheme shall be constructed in accordance with the approved details and thereafter retained.

Reason: To promote a sustainable development consistent with Policies SP0, SP4 and SP6 of the Haringey Local Plan 2013.

 

12.       No development shall take place until a detailed surface water drainage scheme for Site, which is based on sustainable drainage principles and an assessment of the hydrological and hydro-geological context of the development, has been submitted to and approved in writing by the local planning authority. The drainage strategy should demonstrate the surface water run-off generated up to and including the 1 in 100 year plus 30% for climate change critical storm will not exceed the run-off from the undeveloped site following the corresponding rainfall event. The scheme shall include details of its maintenance and management after completion and shall subsequently be implemented in accordance with the approved details before the development on Site is occupied.

Reason: Mechanism for the detailed drainage proposals to be approved as the scheme is developed

 

13.       Completion and Maintenance of Sustainable Drainage - Shown on Approved Plans No building or use hereby permitted shall be occupied or the use commenced until the sustainable drainage scheme for this site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan.

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

14.       No development shall commence until details of a scheme for a "vegetated" or "green" roof(s) for the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority.  The details shall include its (their) type, vegetation, location and maintenance schedule.   The development shall be implemented in accordance with the approved scheme prior to its first occupation and the vegetated or green roof shall be retained thereafter.  No alterations to the approved scheme shall be permitted without the prior written consent of the Local Planning Authority.

 Reason: To ensure a sustainable development consistent with Policy 5.11 of the London Plan 2011 and Policies SP0, SP4 and SP11 of the Haringey Local Plan 2013.

 

15.       No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority and these works shall be carried out as approved. These details shall include: proposed finished levels or contours; means of enclosure; car parking layouts; other vehicle and pedestrian access and circulation areas; hard surfacing materials; minor artefacts and structures (eg. furniture, play equipment, refuse or other storage units, signs, lighting etc.); proposed and existing functional services above and below ground (eg. drainage power, communications cables, pipelines etc. indicating lines, manholes, supports etc.); retained historic landscape features and proposals for restoration, where relevant.

Soft landscape works shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; implementation programme].  The soft landscaping scheme shall include detailed drawings of:

a.         those existing trees to be retained

b.         those existing trees to be removed.

c.         those existing trees which will require thinning, pruning, pollarding or lopping as a result of this consent.  All such work to be approved in writing by the Local Planning Authority.

d.         those new trees and shrubs to be planted together with a schedule of species shall be submitted to, and approved in writing by, the Local Planning Authority prior to the commencement of the development. 

Such an approved scheme of planting, seeding or turfing comprised in the approved details of landscaping shall be carried out and implemented in strict accordance with the approved details in the first planting and seeding season following the occupation of the building or the completion of development (whichever is sooner).  Any trees or plants, either existing or proposed, which, within a period of five years from the completion of the development die, are removed, become damaged or diseased shall be replaced in the next planting season with a similar size and species.  The landscaping scheme, once implemented, is to be retained thereafter.

Reason: In order for the Local Planning Authority to assess the acceptability of any landscaping scheme in relation to the site itself, thereby ensuring a satisfactory setting for the proposed development in the interests of the visual amenity of the area consistent with Policy 7.21 of the London Local Plan 2011, Policy SP11 of the Haringey Local Plan 2013 and Policy UD3 of the Haringey Unitary Development Plan 2006.

 

16.       Samples of materials to be used for the external surfaces of the development shall be submitted to, and approved in writing by, the Local Planning Authority before any development is commenced.  Samples should include sample panels or brick types and a roofing material sample combined with a schedule of the exact product references.

Reason: In order for the Local Planning Authority to retain control over the exact materials to be used for the proposed development and to assess the suitability of the samples submitted in the interests of visual amenity consistent with Policy 7.6 of the London Plan 2015, Policy SP11 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006.

 

17.       Notwithstanding the Provisions of Article 4 (1) and part 25 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995, no satellite antenna shall be erected or installed on the building hereby approved.  The proposed development shall have a central dish or aerial system for receiving all broadcasts for the residential units created: details of such a scheme shall be submitted to and approved by the Local Planning Authority prior to the occupation of the property, and the approved scheme shall be implemented and permanently retained thereafter.

Reason: In order to prevent the proliferation of satellite dishes on the development.

 

INFORMATIVE: In dealing with this application, Haringey Council has implemented the requirements of the National Planning Policy Framework and of the Town and Country Planning (Development Management Procedure) (England) (Amendment No.2) Order 2012 to foster the delivery of sustainable development in a positive and proactive manner.

 

INFORMATIVE: CIL

Based on the information given on the plans, the Mayoral CIL charge will be £22,820 (652 sqm x £35) and the Haringey CIL charge will be £107,580 (652 sqm x £165). This will be collected by Haringey after/should the scheme is/be implemented and could be subject to surcharges for failure to assume liability, for failure to submit a commencement notice and/or for late payment, and subject to indexation in line with the construction costs index.

 

INFORMATIVE: Hours of Construction Work: The applicant is advised that under the Control of Pollution Act 1974, construction work which will be audible at the site boundary will be restricted to the following hours:-

- 8.00am - 6.00pm    Monday to Friday

- 8.00am - 1.00pm    Saturday

- and not at all on Sundays and Bank Holidays.

 

INFORMATIVE: Party Wall Act: The applicant's attention is drawn to the Party Wall Act 1996 which sets out requirements for notice to be given to relevant adjoining owners of intended works on a shared wall, on a boundary or if excavations are to be carried out near a neighbouring building.

 

INFORMATIVE: The new development will require numbering. The applicant should contact the Local Land Charges at least six weeks before the development is occupied (tel. 020 8489 5573) to arrange for the allocation of a suitable address.

 

INFORMATIVE: The London Fire Brigade strongly recommends that sprinklers are considered for new developments and major alterations to existing premises, particularly where the proposals relate to schools and care homes. Sprinkler systems installed in buildings can significantly reduce the damage caused by fire and the consequential cost to businesses and housing providers, and can reduce the risk to life. The Brigade opinion is that there are opportunities for developers and building owners to install sprinkler systems in order to save money, save property and protect the lives of occupier. 

 

INFORMATIVE: With regards to surface water drainage, it is the responsibility of a developer to make proper provision for drainage to ground, water course, or a suitable sewer.  In respect of surface water, it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage.  When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary.  Connections are not permitted for the removal of groundwater.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required.  They can be contacted on 0845 850 2777.

 

INFORMATIVE: Legal changes under The Water Industry (Scheme for the Adoption of private sewers) Regulations 2011 mean that the sections of pipes you share with your neighbours, or are situated outside of your property boundary which connect to a public sewer are likely to have transferred to Thames Water's ownership. Should your proposed building work fall within 3 metres of these pipes we recommend you contact Thames Water to discuss their status in more detail and to determine if a building over / near to agreement is required. You can contact Thames Water on 0800 009 3921 or for more information please visit our website at www.thameswater.co.uk

 

INFORMATIVE: A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer.  Permit enquiries should be directed to Thames Water's Risk Management Team by telephoning 02035779483 or by emailing wwqriskmanagement@thameswater.co.uk. Application forms should be completed on line via www.thameswater.co.uk/wastewaterquality."

 

INFORMATIVE: Thames Water will aim to provide customers with a minimum pressure of 10m head (approx. 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Waters pipes.  The developer should take account of this minimum pressure in the design of the proposed development.

 

INFORMATIVE: Prior to demolition of existing buildings, an asbestos survey should be carried out to identify the location and type of asbestos containing materials.  Any asbestos containing materials must be removed and disposed of in accordance with the correct procedure prior to any demolition or construction works carried out.

 

INFORMATIVES: Network Rail

 