Demolition of the existing two storey building with D1 use on the ground floor and residential use (C3) on the upper floor and erection of part three, part four storey building to provide A1 and D1 uses on the ground floor with ancillary office space and 9 residential units on the upper floors (6 x 2 bed and 3 x 3 bed flats) and associated works.
RECOMMENDATION: grant permission subject to conditions and subject to a s106 legal agreement.
Minutes:
The Committee considered a report on the application to grant planning permission for the demolition of the two storey building with D1 use on the ground floor and residential use (C3) on the upper floor and erection of a part three, part four storey building to provide A1 and D1 uses on the ground floor with ancillary office space and 9 residential units on the upper floors (6 x 2 bed and 3 x 3 bed flats) and associated works. The report set out details of the proposal, the site and surroundings, planning history, relevant planning policy, consultation and responses, analysis, equalities and human rights implications and recommended to grant permission subject to conditions and subject to a s106 legal agreement.
The planning officer gave a short presentation highlighting the key aspects of the report. The Committee’s attention was again drawn to a tabled addendum setting out details of the recent ministerial statement and accompanying guidance setting out changes to national policy for s106 planning obligations for small scale developments and which constituted a material consideration to which the Committee would need to have regard in determining the application. The Chair sought clarification on the applicant’s intentions regarding the s106 contribution in light of the ministerial statement. The applicant’s agent confirmed that the contribution set out within the report would stand.
Concerns were raised over the single aspect nature of some of the residential units and front elevation balconies facing onto a busy road. The applicant’s representative advised that a private courtyard space was planned to the rear of the development to provide additional amenity space. Confirmation was provided that the larger family units benefitted from dual aspects.
The Chair moved the recommendation of the report and it was
RESOLVED
· That planning application HGY/2014/3175 be approved subject to conditions and subject to a s106 legal agreement.
1. The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect.
Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions.
2. The development hereby authorised shall be carried out in accordance with the plans and specifications submitted to, and approved in writing by the Local Planning Authority.
Reason: In order to avoid doubt and in the interests of good planning.
3. Notwithstanding the information submitted with this application, no development shall take place until precise details of the external materials to be used in connection with the development hereby permitted be submitted to, approved in writing by and implemented in accordance with the requirements of the Local Planning Authority and retained as such in perpetuity.
Reason: In order to retain control over the external appearance of the development in the interest of the visual amenity of the area and consistent with Policy SP11 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006.
4. Notwithstanding the Provisions of Article 4 (1) and part 25 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995, no satellite antenna shall be erected or installed on the building hereby approved. The proposed development shall have a central dish or aerial system for receiving all broadcasts for the residential units created: details of such a scheme shall be submitted to and approved by the Local Planning Authority prior to the occupation of the property, and the approved scheme shall be implemented and permanently retained thereafter.
Reason: In order to prevent the proliferation of satellite dishes on the development.
5. No development shall take place until a detailed scheme for the provision of commercial refuse and waste storage and recycling facilities and waste collections have been submitted to and approved in writing by the Local Planning Authority. Such a scheme as approved shall be implemented and permanently retained thereafter.
Reason: In order to protect the amenities of the locality and to comply with Saved Policy UD7 of the Haringey Unitary Development Plan 2006 and Policy 5.17 of the London Plan 2011.
6. No development shall take place, including any works of demolition, until a Method of Construction Statement, to include details of :
a) parking and management of vehicles of site personnel, operatives and visitors
b) loading and unloading of plant and materials
c) storage of plant and materials
d) programme of works (including measures for traffic management)
e) provision of boundary hoarding behind any visibility zones
f) wheel washing facilities:
have been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented and retained during the demolition and construction period.
Reasons: To ensure there are no adverse impacts on the free flow of traffic on local roads and to safeguard the amenities of the area consistent with Policies 6.3, 6.11 and 7.15 of the London Plan 2011, Policies SP0 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006.
7. No works shall be carried out on the site until a detailed report, including risk assessment, detailing management of demolition and construction dust has been submitted and approved by the Local Planning Authority (reference to the London Code of Construction Practice) and that the site of contractor company be registered with the considerate constructors scheme. Proof of registration must be sent to the Local Planning Authority prior to any works being carried out on site.
Reasons: To safeguard the amenities of the area consistent with Policies 6.3, 6.11 and 7.15 of the London Plan 2011, Policies SP0 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006.
8. Prior to the first occupation of the hereby approved nine (9no) residential units, installation details of the boiler to be provided for space heating and domestic hot water are to be submitted to and approved in writing by the Local Planning Authority. The boilers to be provided for space heating and domestic hot water shall have dry NOx emissions not exceeding 40mg/kWh (0%). The boilers are to be installed and permanently retained thereafter, or until such time as more efficient technology can replace those previously approved.
Reason: To ensure that the Code for Sustainable Homes assessment obtains all credits available for reducing pollution, as required by the London Plan 2011 Policy 7.14.
9. The dwellings hereby approved shall achieve a carbon reduction in CO2 emissions of at least 40%. No dwelling shall be occupied until a final Code Certificate has been issued for it certifying that this reduction has been achieved.
Reasons: To ensure that the development achieves a high level of sustainability in accordance with Policies 5.1, 5.2, 5.3 and 5.15 of the London Plan 2011 and Policies SP0 and SP4 the Haringey Local Plan 2013.
10. No building shall be occupied until a final Certificate has been issued certifying that BREEAM (or any such equivalent national measure of sustainable building which replaces that scheme) rating ‘Excellent’ has been achieved for this development,
Or
Evidence that each element of the development is registered with a BREEAM certification body and that a pre-assessment report (or design stage certificate with interim rating if available) has been submitted indicating that the development can achieve the stipulated BREEAM level Excellent shall be presented to the local planning authority within 6 weeks of the date of this decision and a final certificate shall be presented to the local planning authority within 6 months of the occupation of the development.
Reasons: To ensure that the development achieves a high level of sustainability in accordance with Policies 5.1, 5.2, 5.3 and 5.15 of the London Plan 2011 and Policies SP0 and SP4 the Haringey Local Plan 2013.
11. At least one (1no) of the hereby approved nine (9no) residential units shall be wheelchair accessible or easily adaptable for wheelchair use unless otherwise agreed in writing with the Local Planning Authority.
Reason: To ensure that the proposed development meets the Council's Standards for the provision of wheelchair accessible dwellings in accordance with Haringey Local Plan 2013 Policy SP2.
12. No impact piling shall take place until a piling method statement (detailing depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) has been submitted to and approved in writing by the local planning authority in consultation with Thames Water. Any piling must be undertaken in accordance with the terms of the approved piling method statement .
Reason: The proposed works will be in close proximity to underground sewerage utility infrastructure. Piling has the potential to impact on local underground sewerage utility infrastructure. The applicant is advised to contact Thames Water Developer Services on 0845 850 2777 to discuss the details of the piling method statement.
INFORMATIVE 1: In dealing with this application, Haringey Council has implemented the requirements of the National Planning Policy Framework and of the Town and Country Planning (Development Management Procedure) (England) (Amendment No.2) Order 2012 to foster the delivery of sustainable development in a positive and proactive manner.
INFORMATIVE 2: Where a developer proposes to discharge groundwater into a public sewer, a groundwater discharge permit will be required. Groundwater discharges typically result from construction site dewatering, deep excavations, basement infiltration, borehole installation, testing and site remediation. Groundwater permit enquiries should be directed to Thames Water’s Risk Management Team by telephoning 020 8507 4890 or by emailing wwqriskmanagement@thameswater.co.uk. Application forms should be completed online via www.thameswater.co.uk/wastewaterquality. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991.
INFORMATIVE 3: Thames Water would recommend that petrol/oil interceptors be fitted in all car parking/washing/repair facilities. Failure to enforce the effective us of petrol/oil interceptors could result in oil-polluted discharges entering local watercourses.
INFORMATIVE 4: Thames Water will aim to provide customers with a minimum pressure of 10m head (approx. 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Water’s pipes. The developer should take account of this minimum pressure in the design of the proposed development.
INFORMATIVE 5: The new development will require numbering. The applicant should contact the Local Land Charges at least six weeks before the development is occupied (tel. 020 8489 5573) to arrange for the allocation of a suitable address.
INFORMATIVE 6: Community Infrastructure Levy. The application is advised that the proposed development will be liable for the Mayor of London's CIL and Haringey’s Local CIL. Based on the Mayor's CIL charging schedule and the information given on the plans, the charge will be £37,030.00 (1,058 sqm of retail/office and residential floorspace x £35.00) and the Haringey CIL charge will be £11,595.00 (773sqm of residential floorspace x £15.00). This will be collected by Haringey after the scheme is implemented and could be subject to surcharges for failure to assume liability, for failure to submit a commencement notice and/or for late payment, and subject to indexation in line with the construction costs index.
INFORMATIVE 7: The London Fire Brigade strongly recommends that sprinklers are considered for this development. Sprinkler systems installed in buildings can significantly reduce the damage caused by fire and the consequential cost to businesses and housing providers, and can reduce the risk to life.
Please note that the conditions referred to in the minutes are those as originally proposed in the officer’s report to the Sub-Committee; any amended wording, additional conditions, deletions or informatives agreed by the Sub-Committee and recorded in the minuted resolution, will, in accordance with the Sub-Committee’s decision, be incorporated into the Planning Permission as subsequently issued.
Supporting documents: