Construction of 3 residential apartments on the roof of 35-39 The Broadway, comprising 2 x two bed flats and 1 x two bed + study flat, with amenity spaces
RECOMMENDATION: grant permission subject to conditions and subject to a s106 legal agreement.
Minutes:
The Committee considered a report on the application to grant planning permission for the construction of 3 residential apartments to the roof of the building comprising 2 x2bed flats and 1 x2bed + study flat with amenity space. The report set out details of the proposal, the site and surroundings, planning history, relevant planning policy, consultation and responses, analysis, equalities and human rights implications and recommended to grant permission subject to conditions and subject to a s106 legal agreement.
The planning officer gave a short presentation highlighting the key aspects of the report. The attention of the Committee was drawn to a tabled addendum circulated which set out an additional condition requiring approval of a schedule of improvement works to the existing building.
The Chair moved the recommendation of the report and it was
RESOLVED
· That planning application HGY/2014/1619 be approved subject to conditions and subject to a s106 legal agreement.
IMPLEMENTATION
1. The development hereby authorised must be begun not later than the expiration of three years from the date of this permission, failing which the permission shall be of no effect.
Reason: This condition is imposed by virtue of Section 91 of the Town and Country Planning Act 1990 and to prevent the accumulation of unimplemented planning permissions.
DRAWINGS
2. Notwithstanding the information submitted with the application, the development hereby permitted shall only be built in accordance with the following approved plans: PL/100, 110 B, 200, 210, 211, 213, 214, 215, 216, 217 S/P 01
Reason: To avoid doubt and in the interests of good planning.
SAMPLES OF MATERIALS
3. Samples of materials to be used for the external surfaces of the development shall be submitted to, and approved in writing by, the Local Planning Authority before any construction is commenced. Samples should include sample panels or brick types and a roofing material sample combined with a schedule of the exact product references.
Reason: In order for the Local Planning Authority to retain control over the exact materials to be used for the proposed development and to assess the suitability of the samples submitted in the interests of visual amenity consistent with Policy 7.6 of the London Plan 2011, Policy SP11 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006.
Construction and Environmental Management Plan
4. No works shall be carried out on the site until a detailed report, including Risk Assessment, detailing management of demolition and construction dust has been submitted and approved by the LPA. This shall be with reference to the London Code of Construction Practice. The development shall be carried out in accordance with the approved report unless otherwise agreed in writing by the Local Planning Authority.
Reason: In order to protect the amenities of the locality and reduce the impact of the proposed development
Considerate Constructors
5. No development shall be carried out until such time as the person carrying out the work is a member of the Considerate Constructors Scheme and its code of practice, and the details of the membership and contact details are clearly displayed on the site so that they can be easily read by members of the public.
Reason: In the interests of residential amenity.
Construction Management Plan and Construction Logistics Plan
6. The applicant/developer is required to submit a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) for the local authority’s approval prior to construction work commencing on site. The Plans should provide details on how construction work (including any demolition) would be undertaken in a manner that disruption to traffic and pedestrians on Crouch End Broadway, Crouch Hall Road and the surrounding roads is minimised, construction vehicle movements should be carefully planned and co-ordinated to avoid the AM and PM peak periods.
Reason: To reduce congestion and mitigate any obstruction to the flow of traffic on the transportation and highways network.
GREEN ROOF
7. No development shall commence until details of a scheme for a "vegetated" or "green" roof(s) for the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The details shall include its (their) type, vegetation, location and maintenance schedule. The development shall be implemented in accordance with the approved scheme prior to its first occupation and the vegetated or green roof shall be retained thereafter. No alterations to the approved scheme shall be permitted without the prior written consent of the Local Planning Authority.
Reason: To ensure a sustainable development consistent with Policy 5.11 of the London Plan 2011 and Policies SP0, SP4 and SP11 of the Haringey Local Plan 2013.
Combustion and Energy Plant
8. Prior to installation details of the boiler to be provided for space heating and domestic hot water should be forwarded to the Local Planning Authority. The boilers to be provided for space heating and domestic hot water shall have dry NOx emissions not exceeding 40 mg/kWh (0%).
Reason: To ensure that the Code for Sustainable Homes assessment obtains all credits available for reducing pollution, as required by UDP Policy ENV7 and The London Plan Policy 7.14.
CODE FOR SUSTAINABLE HOMES
9. The dwelling(s) hereby approved shall achieve Level 4 of the Code for Sustainable Homes. No dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 has been achieved.
Reasons: To ensure that the development achieves a high level of sustainability in accordance with Policies 5.1, 5.2, 5.3 and 5.15 of the London Plan 2011 and Policies SP0 and SP4 the Haringey Local Plan 2013.
INFORMATIVE: CIL
The applicant is advised that the proposal will be liable for the Mayor of London’s CIL. Based on the Mayor’s CIL charging schedule and the information given on the plans, the charge will be £9,800 (280 x £35). This will be collected by Haringey after the scheme is implemented and could be subject to surcharges for failure to assume liability, for failure to submit a commencement notice and/or for late payment, and subject to indexation in line with the construction costs index.
INFORMATIVE: Hours of Construction Work
The applicant is advised that under the Control of Pollution Act 1974, construction work which will be audible at the site boundary will be restricted to the following hours:-
8.00am - 6.00pm Monday to Friday
8.00am - 1.00pm Saturday and not at all on Sundays and Bank Holidays.
INFORMATIVE: Party Wall Act
The applicant's attention is drawn to the Party Wall Act 1996 which sets out requirements for notice to be given to relevant adjoining owners of intended works on a shared wall, on a boundary or if excavations are to be carried out near a neighbouring building.
INFORMATIVE: Land Ownership
The applicant is advised that this planning permission does not convey the right to enter onto or build on land not within his ownership.
INFORMATIVE: Thames Water
Thames Water will aim to provide customers with a minimum pressure of 10m head (approx 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Waters pipes. The developer should take account of this minimum pressure in the design of the proposed development.
INFORMATIVE: Street Naming and numbering
The new development will require numbering. The applicant should contact the Local Land Charges at least six weeks before the development is occupied (tel. 020 8489 5573) to arrange for the allocation of a suitable address.
INFORMATIVE: Building Regulations
This type of work will require a Building Regulations application to be made after Planning permission has been granted. We have been working to expand and improve the services and products we can offer our customers such as warranties, fire engineering, fire risk assessments, structural engineering, party wall surveying, SAP, EPC, SBEM calculations, BREEAM, CfSH calculations, acoustic advice, air pressure testing etc in consultation with the LABC (Local Authority Building Control) and we would be pleased to explain any of the services in more detail if required. Please contacts us with any queries you may have at: building.control@haringey.gov.uk
INFORMATIVE: The London Fire Authority: Sprinklers
The London Fire Authority strongly recommends that sprinklers are considered for new development and major alterations to existing premises. Sprinkler systems installed in buildings can significantly reduce the damage cause by fire and the consequential cost to businesses and housing providers, and can reduce the risk to life. The Brigade’s opinion is that there are opportunities for developers and building owners to install sprinklers systems in order to save money save property and protect the lives of occupiers. Please note that it is The London Fire Authority’s policy to regularly advise our elected Members about how many cases there have been where we have recommended sprinklers and what the outcomes of those recommendations were. These quarterly reports to their Members are public documents which are available on their website.
INFORMATIVE: Green roof
With regard to condition 7 the green roof submission must provide/comprise of the following information:
a) biodiversity based with extensive/semi-intensive soils
b) substrate which is commercial brick-based aggregate or equivalent with a varied substrate depth of 80 -150mm planted with 50% locally native herbs/wildflowers in addition to sedum.
c) There should be a minimum of 10 species of medium ecological value and as listed in the Environment Agency's Green Roof Toolkit.
d) include additional features such as areas of bare shingle, areas of sand for burrowing invertebrates
e) a report from a suitably qualified ecologist specifying how the living roof has been developed for biodiversity with details of landscape features and a roof cross section