159 Tottenham Lane, N8

Erection of four storey building over 1 basement level comprising parking/storage, with 2 retail units with 4 disabled parking spaces at ground floor level, 2 office units at first floor level and residential units at first, second and third floor levels comprising 16 flats.

 

RECOMMENDATION: Grant permission subject to conditions and Section 106 agreement.

Minutes:

The Committee considered a report, previously circulated, which gave details of the application, the applicant’s case, the site and its environment, planning history and all of the relevant planning factors and policies.

 

It was noted that a number of the drawings had been revised and the following references should be amended to read as follows:

 

153 and 103b were replaced with 105a

106 – 108, 112 – 114 and 116 were replaced with ?

111a was replaced with 111b

105b was replaced with 105a

 

In response to concerns raised with respect to the number of units offered for Affordable Housing, the Committee was advised that a financial appraisal had been undertaken by officers and the Affordable Housing provision was considered acceptable. The Committee was reminded that the target of 50% Affordable Housing was an average figure to be achieved across all planning applications. Therefore there was flexibility to accept a lower level where this was considered appropriate.

 

It was noted that one of the three bedroom flats was slightly smaller than the others and there was agreement that if the application were approved a condition should be added to specify that this was the unit offered as Affordable Housing.

 

It was confirmed that the existing fire escapes would be incorporated into the landscaping scheme.

 

The Committee discussed the financial appraisal system used and there was agreement that a report should be brought to a future meeting on this.

 

RESOLVED:

 

That, subject to the conditions set out below, planning application reference HGY/2009/1593 be approved.

 

Conditions

 

1. The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect.

 

Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions.

 

2. The development hereby authorised shall be carried out in complete accordance with the plans and specifications submitted to, and approved in writing by the Local Planning Authority.

 

Reason: In order to ensure the development is carried out in accordance with the approved details and in the interests of amenity.

 

3. Notwithstanding the description of the materials in the application, no development shall be commenced until precise details of the materials to be used in connection with the development hereby permitted have been submitted to, approved in writing by and implemented in accordance with the requirements of the Local Planning Authority.

 

Reason: In order to retain control over the external appearance of the development in the interest of the visual amenity of the area.

 

4. Surface water drainage works and source control measures shall be carried out in accordance with details which have been submitted to and approved in writing by the local planning authority before development commences.

 

Reason: To prevent the increased risk of flooding.

 

5. The construction works of the development hereby granted shall not be carried out before 0800 or after 1800 hours Monday to Friday or before 0800 or after 1200 hours on Saturday and not at all on Sundays or Bank Holidays.

 

Reason: In order to ensure that the proposal does not prejudice the enjoyment of neighbouring occupiers of their properties.

 

6. An enclosure for dustbins in accordance with guidance issued by the Local Planning Authority shall be provided prior to the occupation of the building as flats. Details of design, materials and location of the dustbin enclosure shall be agreed in writing prior to the occupation of the building.

 

Reason: In order to ensure a satisfactory appearance to the building and to safeguard the enjoyment by neighbouring occupiers of their properties and the appearance of the locality.

 

7. The proposed development shall have a central dish/aerial system for receiving all broadcasts for all the residential units created, details of such a scheme shall be submitted to and approved by the Local Planning Authority prior to the occupation of the property and the approved scheme shall be implemented and permanently retained thereafter.

 

Reason: In order to protect the visual amenities of the neighbourhood.

 

8. No development shall commence until 2) and 3) below are carried out to the approval of London Borough of Haringey.

 

1). The Applicant will submit a site-wide energy strategy for the proposed development. This strategy must meet the following criteria:

 

2.) (a) Inclusion of a site-wide energy use assessment showing projected annual demands for thermal (including heating and cooling) and electrical energy, based on contemporaneous building regulations minimum standards. The assessment must show the carbon emissions resulting from the projected energy consumption.

 

(b) The assessment should demonstrate that the proposed heating and cooling systems have been selected in accordance with the following order of preference: passive design; solar water heating; combined heat and power for heating and cooling, preferably fuelled by renewables; community heating for heating and cooling; heat pumps; gas condensing boilers and gas central heating.  The strategy should examine the potential use of CHP to supply thermal and electrical energy to the site. Resulting carbon savings to be calculated.

 

(c) Inclusion of onsite renewable energy generation to reduce the remaining carbon emissions (i.e. after (a) is accounted for) by 10% subject to feasibility studies carried out to the approval of LB Haringey.

 

3). All reserved matters applications must contain an energy statement demonstrating consistency with the site wide energy strategy developed in 2). Consistency to be approved by LB Haringey prior to the commencement of development.

 

Reason: To ensure the development incorporates energy efficiency measures including on-site renewable energy generation, in order to contribute to a reduction in Carbon Dioxide Emissions generated by the development in line with national and local policy guidance.

 

Reason: To ensure the development incorporates energy efficiency measures including on-site renewable energy generation, in order to contribute to a reduction in Carbon Dioxide Emissions generated by the development in line with national and local policy guidance.

 

9. That a detailed scheme for the provision of refuse and waste storage within the site shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the works. Such a scheme as approved shall be implemented and permanently retained thereafter to the satisfaction of the Local Planning Authority.

 

Reason: In order to protect the amenities of the locality.

 

10. No development shall take place until site investigation detailing previous and existing land uses, potential land contamination, risk estimation and remediation work if required have been submitted to and approved  in writing by the Local Planning Authority and these works shall be carried out as approved.

 

Reason: In order for the Local Planning Authority to ensure the site is contamination free.

 

11. That the levels of all thresholds and details of boundary treatment be submitted to and approved by the Local Planning Authority.

 

Reason: In order to safeguard the visual amenity of the area and to ensure adequate means of enclosure for the proposed development.

 

Informative: The applicant is advised that in the interests of the security of the development hereby authorised that all works should comply with BS 8220 (1986), Part 1 - 'Security Of Residential Buildings'.

 

Informative: The new development will require naming / numbering. The applicant should contact the Transportation Group at least six weeks before the development is occupied (tel. 020 8489 5573) to arrange for the allocation of a suitable address.

 

Informative: In regards to surface water drainage Thames Water point out that it is the responsibility of the developer to make proper provision for drainage to ground, water courses or surface water sewer. It must not be allowed to drain to the foul sewer as this is the major contributor to sewer flooding. Thames Water recognises the environmental and economic benefits of surface water source control and encourages its appropriate application where it is to the overall benefit of our customers. Hence, in the disposal of surface water, Thames Water will recommend that the Applicant: a) Looks to ensure that new connections to the public sewerage system do not pose an unacceptable threat of surcharge, flooding or pollution, b) check the proposals are in line with advice from the DETR which encourages, wherever practicable, disposal on site without recourse to the public sewerage system - for example in the form of soakaways or infiltration areas on free draining soils and c) looks to ensure the separation of foul and surface water sewerage on all new developments.

 

Reasons For Approval

 

The proposed development for complies with Policies, UD3 'General Principles', UD4 'Quality Design', UD7 'Waste Storage', UD8 'Planning Obligations', HSG1 'New Housing Developments', HSG2 'Change of Use to Residential', HSG9 'Density Standards', HSG10 'Dwelling Mix', EMP5 'Promoting Employment Uses' and M10 'Parking for Development' of the Haringey Unitary Development Plan (2006) and Supplementary Planning Guidance SPG1a 'Design Guidance', SPD - Housing, SPG3b 'Privacy/Overlooking, Aspect/Outlook, Daylight/Sunlight', SPG7a 'Parking Standards', SPG8a 'Waste and Recycling', SPG10a 'The Negotiation, Management and Monitoring of Planning Obligations', SPG10c 'Educational Needs Generated by New Housing Development' and SPG10e 'Improvements to Public Transport Infrastructure and Services'.

 

Section 106: Yes

 

 

 