(Report of the Director of Place and Sustainability): To appoint an architectural design team for the development of two major public realm improvements schemes in Wood Green and the Green Lanes area.
Minutes:
The Leader considered a report that sought approval to appoint an architectural design team, as detailed within (exempt) Appendix 3 paragraph 8.1 of the report, to undertake work with respect to the development of two major public realm improvements schemes in the Wood Green and Green Lanes areas.
It was noted that the Wood Green Town Centre scheme was being funded by Transport for London (TfL) and would focus on public realm and highways infrastructure improvements. A total of £4.2m was being provided by TfL for the improvements.
Work in the Green Lanes area would focus on two areas the first being improvements to public realm, shop fronts and the railway bridge, which was being funded by £1.8m from the Outer London Fund. The second would also assist in the delivery of public realm improvements and highways infrastructure improvements and was being delivered from £1.2m of funding from the TfL Corridor Scheme.
RESOLVED:
That the appointment of the consultant, as detailed within (exempt) Appendix 3 paragraph 8.1 of the report, be approved.