Issue - meetings

Haringey Draft Preliminary Charging Schedule for a Community Infrastructure Levy (CIL)

Meeting: 10/07/2012 - Cabinet (Item 195)

195 Haringey Draft Preliminary Charging Schedule for a Community Infrastructure Levy (CIL) pdf icon PDF 1 MB

(Report of the Director of Place and Sustainability to be introduced by the Cabinet Member for Economic Regeneration and Social Inclusion). To provide an update on progress with respect to Haringey’s Community Infrastructure Levy.

 

Additional documents:

Minutes:

 

Cabinet considered a report that provided an update on progress in preparing for the introduction of Haringey’s Community Infrastructure Levy (CIL).

 

It was noted that the CIL Regulations 2010 allowed local authorities and the Greater London Council (GLA) to introduce a CILs on new net floor areas comprising 100msq or more of new internal floor space to contribute towards any new infrastructure required as a result of the development. CIL would replace the s106 tariff, although the s106 tariff would continue to be applicable for over ten units of housing and anything which was site specific. 

 

The report set out the proposed preliminary charging schedules for consultation which had been compiled following research and a viability study. 

 

RESOLVED:

 

  1. That consultation should proceed between July and September 2012 on the Preliminary Charging Schedule for Haringey’s CIL based on the following rates for residential development:

 

Area

Haringey CIL

Mayoral CIL

Total Charge

West

Highgate

Hornsey

Muswell Hill

Finsbury Park

£265

£35

£300

Central

Wood Green

£165

£35

£200

North East

Seven Sisters

Tottenham Hale

Tottenham

£15

£35

£50

 

  1. That a nil rate be charged on smaller retail, office and industrial development to reflect the paucity of such development currently coming forward in Haringey and its tenuous viability in the current economic climate. A rate of £95 per square metre is recommended for supermarkets and £25 per square metre for retail warehouses exclusive of Mayoral CIL:

 

Area

Haringey CIL

Mayoral CIL

Total

Borough wide –

Supermarkets

£95

£35

£130

Borough wide –

Retail warehouse

£25

£35

£60

 

  1. That the responses received should be reported to the Cabinet Member for Economic Regeneration and Social Inclusion prior to revising the schedule as appropriate and proceeding to consultation on the Draft Consultation Schedule for a statutory period of four weeks in November and December 2012.

 

  1. That a report should be brought back to Cabinet in February 2013 on the feedback received as a result of the second round of consultation and recommending a final submission draft Charging Schedule for an independent examination.