Members were advised that planning permission for a previous application for the site had been refused in May 2013, with the applicant now in the process of developing a new scheme. Officers advised that ongoing discussions were underway with the applicant regarding the new application, with a focus on design and viability in light of the grounds given for refusal of the previous application. It was anticipated that an application would be submitted for determination by the end of the year.

 

Members made the following comments on the scheme:

·         Security concerns were raised about the proposed basement level car parking provision. The applicant provide assurance that the design for this element would meet the latest standards to ensure that in tandem with ongoing maintenance, the area would be secure and usable. Parking had been identified as a particular concern for local residents consulted on the scheme and had been one of the grounds for refusal of the original application.

·         The Committee raised concern over the low level of affordable housing contribution mooted for the scheme by the applicant’s rep and the likelihood of this consisting of an off site contribution. The applicant advised that an initial £1.35m off site contribution had been calculated utilising the GLA toolkit and which reflected the high value of the land in conjunction with the high construction costs for the design plus the reluctance of RSLs to manage a small number of affordable housing units on a scheme.

·         Clarification was sought on the potential for overlooking between flats as a result of the curved shape to the wings of the scheme. Assurances were provided that the curve was slight and in the unlikely event any overlooking materialised between units, screening linked to the green roofs could be provided in mitigation.

·         Confirmation was provided that the overall height of the scheme remained unchanged from the original application in order to create the landmark building that the applicant considered the site, due to its location, warranted. 

·         Members queried the north facing orientation of the main building and the potential impact this could have on daylight to the flats. Confirmation was provided that the windows to the units would be perpendicular to the main mass of the building to address this issue and which was inline with guidelines.

·         Assurances were provided that the scheme would contain sufficient cycle stands in compliance with Council and London Plan requirements and that finishes to external materials would be selected that would age well. 

·         Members sought clarification on the designation of the site. The land was currently a steel yard used primarily for the storage of steel girders, with limited employment on site. Officers confirmed that the site was not designated an employment site nor included within the draft strategic sites DPD or in Heartlands SPD area but classified as an ecological corridor. Approval could therefore be granted for housing on site subject to compliance with the UDP policy and in consideration of the planned provision of replacement commercial space onsite.

·         In response to a question regarding the ecology of the site, it was advised that the scheme would improve the ecological value of the site from its current guise through compliance with code level 4 for sustainable homes including the provision of green roofs and communal gardens.  

 